MEC18-03406
| Conference | 7/17/2018 | 7/17/2018 | 7/17/2018 3:42:01 PM | P | DONE |
|
|
Meet brian at 3:00 Contractor to verify material in wall is plenum rated or redesign system by mechanical engineer.
|
MEC18-01544
| Pressure Test | 7/16/2018 | 7/17/2018 | 7/17/2018 11:45:33 AM | A | PASS |
|
|
Hydronic Pressure Test on Main Phone #: ###-#### Inspection requested via web by RM Mechanical main from penthouse to first floor
|
MEC18-02314
| Rough-in | 7/16/2018 | 7/17/2018 | 7/17/2018 11:45:03 AM | A | PASS |
|
|
Please do a rough-in and pressure witness. The lock box code is "5234" if no one is there. Call James at ###-#### with any questions, thanks. Inspection requested via web by 4 Seasons gas fireplace, two supply runs, gas piping with 25# test and dryer duct.
|
MEC18-03289
| Final | 7/16/2018 | 7/17/2018 | 7/17/2018 9:27:21 AM | A | FAIL |
|
|
Homeowner requested first thing in the morning if possible, Please call Willis at ###-#### Phone #: ###-#### Inspection requested via web by Carolyn Rudd Need to have flue tested at 5psi and witness the test. Called contractor to make correction.
|