ELE11-00726
| ELE-Aging Inspection | 11/3/2011 | 11/3/2011 | 11/7/2011 8:35:40 AM | | PASS |
|
|
see final
|
ESC11-00601
| General Inspection | 11/3/2011 | 11/3/2011 | 11/4/2011 1:37:55 PM | | PASS |
|
|
site clean, sediment barriers in place
|
ELE10-01892
| Final | 11/3/2011 | 11/3/2011 | 11/3/2011 9:14:21 PM | P | DONE |
|
|
electrical contractor done with job at rough-in stage and wants job finaled out. To finish electrical,new permit will be required. final ok
|
ELE11-01308
| Electrical Rough-In | 11/3/2011 | 11/3/2011 | 11/3/2011 4:35:10 PM | P | PASS |
|
|
7/29/2011 Lobby #1 rough-in ok cover perimeter hard lid ceiling
|
ELE11-01308
| Electrical Rough-In | 11/3/2011 | 11/3/2011 | 11/3/2011 4:34:46 PM | P | PASS |
|
|
7/21/2011 Lobby #1 rough-in ok cover north wall,one side only. ok cover entry canopy ceiling
|
ELE11-01308
| Electrical Rough-In | 11/3/2011 | 11/3/2011 | 11/3/2011 4:34:14 PM | P | PASS |
|
|
7/20/2011 Lobby #1 rough-in ok cover bathroom walls
|
ELE11-01308
| Electrical Rough-In | 11/3/2011 | 11/3/2011 | 11/3/2011 4:33:56 PM | P | PASS |
|
|
7/06/2011 Lobby #1 rough-in ok cover walls in main lobby area
|
ELE10-01707
| ELE-Aging Inspection | 11/3/2011 | 11/3/2011 | 11/3/2011 3:14:50 PM | | DONE |
|
|
still under construction, additional elect. permit pulled by Boise Basin Electric
|
ELE10-01508
| ELE-Aging Inspection | 11/3/2011 | 11/3/2011 | 11/3/2011 2:29:12 PM | | DONE |
|
|
still under construction, ready for final soon
|
ELE11-02489
| Electrical Rough-In | 11/3/2011 | 11/3/2011 | 11/3/2011 2:10:48 PM | P | PASS |
|
|
call first ###-#### Phone #: ###-#### >> Inspection requested via web by PAT MILLER p/s o/h rec ok
|
ELE11-02355
| Final | 11/2/2011 | 11/3/2011 | 11/3/2011 2:00:12 PM | P | PASS |
|
|
After 2pm---Brian Phone #: ###-#### final ok
|
ELE11-02490
| Electrical Rough-In | 11/3/2011 | 11/3/2011 | 11/3/2011 1:34:23 PM | P | FAIL |
|
|
At the chase building elevator enter 9443 and it will take you to 9th floor and it''s the last condo #905 and the door will be opened Phone #: ###-#### >> Inspection requested via web by daniel bibikov Cannot run MC cable inside 2x4 steel studs, other than to just pass through. Attic J-boxes shall be accessable
|
GCE11-00132
| GCE-Rough-In Permanent Service | 11/2/2011 | 11/3/2011 | 11/3/2011 10:42:33 AM | A | PASS |
|
|
Leanne @ ###-#### p/s o/h new panel
|
GCE11-00133
| GCE-Permanent Service | 11/2/2011 | 11/3/2011 | 11/3/2011 9:56:26 AM | A | PASS |
|
|
###-#### p/s o/h n ok
|
ELE11-02484
| Conference | 11/2/2011 | 11/3/2011 | 11/3/2011 9:43:05 AM | A | DONE |
|
|
dix please call 30 min before going out Phone #: ###-#### talked with home, requirements for new service on unattached garage, Hot tub circuit ,service outlet. receptacles and lights in garage
|
ELE11-02119
| Final | 11/2/2011 | 11/3/2011 | 11/3/2011 8:45:25 AM | A | PASS |
|
|
Kenny Phone #: ###-#### final ok
|
ELE11-02472
| Electrical Rough-In | 11/3/2011 | 11/3/2011 | 11/3/2011 8:27:04 AM | A | PASS |
|
|
Garage addition rough-in. Thank you! Phone #: ###-#### >> Inspection requested via web by Adam Staigle
|
ELE11-01924
| Electrical Rough-In | 11/2/2011 | 11/3/2011 | 11/2/2011 1:59:22 PM | A | PASS |
|
|
If you have any questions you can call Bill at ###-####. Phone #: ###-#### >> Inspection requested via web by Rhonda Yoast rough-in ok cover trench
|