Inspections for the day of: Friday, March 22, 2019.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDaryl DeGrange
TitleELE-INSPECTION SUPV
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-00589 Conference3/21/20193/22/20193/22/2019 3:47:04 PMPDONE
Could you please meet us at 2:30 in the back of the store for a conference with fire guys and all involved. Thank you, Greg. Phone #: ###-#### Inspection requested via web by Greg Idsinga Discuss fire separation from domestic service gear and fire pump equipment
ELE16-02437 ELE-Request for Extension3/22/20193/22/20193/22/2019 1:39:49 PMPPASS
Mr. Seeliger has requested an Extension to complete his project. Extension ok
ELE18-01391 Electrical Rough-In3/21/20193/22/20193/22/2019 12:39:11 PMAFAIL
Contact Tony for level 3 area C above ceiling and casework. Phone #: ###-#### Inspection requested via web by Tom Betty NEC 330.12(1) MC cable shall not be installed where subject to physical damage. Raceway shall not be supported by luminair seismic wire.
ELE19-00940 Electrical Rough-In3/21/20193/22/20193/22/2019 11:05:25 AMAPASS
Please call Mike Cole ###-#### with any questions.
Thank you! Phone #: ###-#### Inspection requested via web by Bonnie Page Rough-in ok cover entry, livingroom area
ELE19-00498 Final3/22/20193/22/20193/22/2019 10:41:04 AMAPASS
Home owners will be home, sub panel with arc fault breaker is in furnace room Phone #: ###-#### Inspection requested via web by steve sellers final ok
ELE18-04479 Final3/21/20193/22/20193/22/2019 10:07:43 AMAFAIL
Jay Phone #: ###-#### Chico sealant not poured in sealoffs
ELE19-00889 Rough-In Permanent Service3/22/20193/22/20193/22/2019 9:21:43 AMAPASS
Darryn Phone #: ###-#### Duplex rough-in p/s u/g n ok