Inspections for the day of: Tuesday, March 31, 2015.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDaryl DeGrange
TitleELE-INSPECTION SUPV
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE11-01678 ELE-Aging Inspection3/31/20153/31/20154/2/2015 4:36:56 PM DONE
left message with contractor
ELE14-03420 Final3/31/20153/31/20153/31/2015 3:26:08 PMPPASS
Phone #: ###-#### Inspection requested via web by Emmet Bushman Inground Hot Tub permited by other contractor, correction done, final ok
ELE15-00849 Electrical Rough-In3/31/20153/31/20153/31/2015 2:35:07 PMPPASS
Underground ; Bonding Inspection Phone #: ###-#### Inspection requested via web by Louis Keller rough-in ok cover
ELE15-00256 Final3/30/20153/31/20153/31/2015 2:15:02 PMPPASS
Phone #: ###-#### Inspection requested via web by Gerald McLain correction done, final ok
ELE15-00256 Electrical Rough-In3/30/20153/31/20153/31/2015 1:51:45 PMPPASS
ceiling rough re-inspection Phone #: ###-#### Inspection requested via web by Gerald McLain rough-in ok cover ceiling grid
ELE15-00807 Electrical Rough-In3/30/20153/31/20153/31/2015 11:42:10 AMAPASS
Bathroom remodel rough in Phone #: ###-#### Inspection requested via web by Randy Fletcher rough-in ok cover
ELE14-03229 Final3/30/20153/31/20153/31/2015 9:35:45 AMAFAIL
Any questions please let me know, thx, TW Phone #: ###-#### Inspection requested via web by Stephen Kren Hall Bathroom 210.52(D) More than one basin, a receptacle is reqired adjacent to each basin location or one receptacle between the two basins. Stairway luminaires not working.