ELE12-02746
| ELE-Aging Inspection | 5/8/2015 | 5/8/2015 | 5/13/2015 10:42:47 AM | | DONE |
|
|
ready for final, contractor will schedule inspection
|
ELE13-00818
| Final | 5/8/2015 | 5/8/2015 | 5/8/2015 3:53:39 PM | P | PASS |
|
|
job complete, final ok
|
ELE15-00938
| Electrical Rough-In | 5/8/2015 | 5/8/2015 | 5/8/2015 3:46:30 PM | P | PASS |
|
|
Floor heat master bath. Please call me half an hour before inspection to insure access. Phone #: ###-#### Inspection requested via web by Shaun Kirkman rough-in ok cover CSA Listed floor heat master bathroom
|
ELE15-01357
| Electrical Rough-In | 5/8/2015 | 5/8/2015 | 5/8/2015 3:15:33 PM | P | PASS |
|
|
Please give me half an hour to notice to insure access Thanks Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman rough-in ok cover kitchen remodel
|
ELE15-01335
| Permanent Service | 5/7/2015 | 5/8/2015 | 5/8/2015 2:46:00 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by michael hunt p/s o/h rec ok
|
ELE15-01297
| Final | 5/6/2015 | 5/8/2015 | 5/8/2015 2:25:58 PM | A | PASS |
|
|
Office area remodel, removed cubicles and added 2 new offices. Phone #: ###-#### Inspection requested via web by Steve Moss final ok
|
ELE15-01358
| Final | 5/8/2015 | 5/8/2015 | 5/8/2015 1:09:20 PM | P | PASS |
|
|
job complete, final ok
|
ELE15-01358
| Electrical Rough-In | 5/8/2015 | 5/8/2015 | 5/8/2015 1:08:57 PM | P | PASS |
|
|
Add 240v circuit for steam humidifier. Job is complete NEED FINAL Phone #: ###-#### Inspection requested via web by Stuart Welton rough-in ok
|
ELE15-00740
| Permanent Service | 5/7/2015 | 5/8/2015 | 5/8/2015 11:16:04 AM | A | PASS |
|
|
Please call Dan 30 minutes ahead as he is not on site. Thanks Phone #: ###-#### Inspection requested via web by Kerri Hamilton p/s u/g rec ok
|
ELE15-01338
| Conference | 5/7/2015 | 5/8/2015 | 5/8/2015 11:01:57 AM | A | DONE |
|
|
Elaine-please call 30 minutes prior to meet Phone #: ###-#### Spoke with homeowner about electrical requirements for remodel.
|
ELE15-00758
| Final | 5/7/2015 | 5/8/2015 | 5/8/2015 9:42:16 AM | A | PASS |
|
|
If at all possible please call 1 hour before arrival, Name Tom Bartlett ###-#### Phone #: ###-#### Inspection requested via web by shane miller final ok
|
ELE15-01347
| Rough-In Permanent Service | 5/7/2015 | 5/8/2015 | 5/8/2015 9:19:47 AM | A | PASS |
|
|
Need to be able to energize new service, then do change-over and call for final inspection. New main ground wire is installed to where water line enters house just inside kitchen door. Phone #: ###-#### Inspection requested via web by Troy Cobb Rough-in p/s o/h rec ok
|
ELE15-00710
| Electrical Rough-In | 5/7/2015 | 5/8/2015 | 5/8/2015 8:50:35 AM | A | PASS |
|
|
CONTACT: JEREMY KNIGHT. POLE BASE INSPECTION PLEASE Phone #: ###-#### Inspection requested via web by Deb Gooden rough-in ok cover
|
ELE15-01268
| Final | 5/7/2015 | 5/8/2015 | 5/8/2015 8:38:44 AM | A | PASS |
|
|
Brent Phone #: ###-#### final ok
|
ELE15-01307
| Final | 5/8/2015 | 5/8/2015 | 5/8/2015 7:37:07 AM | A | PASS |
|
|
Owner has decided not to re-wire despite open knob and tube spices in attic covered with insulation. Job is not being performed by us and has been closed. Phone #: ###-#### Inspection requested via web by David Seilheimer final ok
|