Inspections for the day of: Tuesday, June 16, 2015.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDaryl DeGrange
TitleELE-INSPECTION SUPV
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE15-01541 Final6/16/20156/16/20156/16/2015 3:53:59 PMPFAIL
Phone #: ###-#### Inspection requested via web by Karl Paige Not all luminaires have support wires at opposing corners. NEC 300.11 Fixture whips shall be supported off ceiling grid. NEC 348.30 FMC metal raceways shall be supported NE 800.25 Shall remove all abandoned cables and conduit
ELE15-01617 Electrical Rough-In6/16/20156/16/20156/16/2015 2:25:24 PMPPASS
Ron Hamilton Phone #: ###-#### Inspection requested via web by Kerri Hamilton Rough-in ok cover underground service feeders to location of stub-ups
ELE15-01303 Electrical Rough-In6/16/20156/16/20156/16/2015 1:56:37 PMPPASS
Ryan Barnes Phone #: ###-#### Inspection requested via web by Kerri Hamilton Rough-in ok pour basement interior walls
ELE14-03246 Electrical Rough-In6/15/20156/16/20156/16/2015 11:56:51 AMAPART
Levi. Tower #1 Partial Final units #4 Phone #: ###-#### Inspection requested via web by Sean DeLacy partial final rooms 430 thur 437
MIS15-00133 ELE-Final6/15/20156/16/20156/16/2015 10:31:15 AMAPASS
correction completed, final ok
ELE15-02132 Conference6/15/20156/16/20156/16/2015 12:00:00 AMADONE
Discuss possibility of final on half of the residential units by August 15 and the other half at a later date. Phone #: ###-#### Inspection requested via web by Rafael Castillo Temporary occupancy would require approval from Project Management Ron Hill and Fire Marshall Romeo Gervais
ELE15-02132 Electrical Rough-In6/15/20156/16/20156/16/2015 12:00:00 AMAPASS
4th floor corridors, soffit ceilings (drops in units). Phone #: ###-#### Inspection requested via web by Rafael Castillo Rough-in ok cover