Inspections for the day of: Thursday, January 16, 2020.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-04521 BLD-Framing/Rough-in1/16/20201/16/20201/17/2020 7:10:36 AMPPART
2nd. floor, neeeds to complee firecaulking at toilets and tub drains. Provide UL listed assembly for through penetrations of fresh air intakes at 1hr. fire barrier walls.
BLD19-04949 BLD-Final1/15/20201/16/20201/16/2020 4:27:03 PMPPASS
Brian Phone #: ###-####
BLD19-04950 BLD-Final1/15/20201/16/20201/16/2020 4:26:49 PMPPASS
Brian Phone #: ###-####
BLD19-04255 BLD-Energy code compliance1/15/20201/16/20201/16/2020 1:47:41 PMPPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD19-04255 BLD-Framing/Rough-in1/15/20201/16/20201/16/2020 1:47:28 PMPPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD19-04991 BLD-Final1/15/20201/16/20201/16/2020 12:56:01 PMAPEND
Memo Garcia ###-#### (mech insp is scheduled for this AM). Needs mech final to pass.
BLD19-02013 BLD-Final1/15/20201/16/20201/16/2020 9:49:49 AMANR
garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs mech final.
BLD19-02012 BLD-Final1/15/20201/16/20201/16/2020 9:49:27 AMANR
garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs mech final.
BLD19-01141 BLD-Final1/15/20201/16/20201/16/2020 9:48:40 AMAPEND
Alex Phone #: ###-####. everything ok, need final letter from 3rd. party inspection firm.
BLD19-03364 BLD-Framing/Rough-in1/15/20201/16/20201/16/2020 8:59:40 AMAPASS
Sam Phone #: ###-####. All framing correction have been made. Ok to insulate.
BLD19-04765 BLD-Final1/15/20201/16/20201/16/2020 8:43:19 AMAPASS
Alice Phone #: ###-####. All issues resolved. Ok for perm occ.