Inspections for the day of: Tuesday, January 17, 2017.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-02646 BLD-Energy code compliance1/17/20171/17/20171/17/2017 4:14:41 PMPPASS
Pat Phone #: ###-####
BLD16-02646 BLD-Framing/Rough-in1/17/20171/17/20171/17/2017 4:14:27 PMPPASS
Pat Phone #: ###-####
BLD16-02645 BLD-Energy code compliance1/17/20171/17/20171/17/2017 4:13:45 PMPPASS
Pat Phone #: ###-####
BLD16-02645 BLD-Framing/Rough-in1/17/20171/17/20171/17/2017 4:13:02 PMPPART
Pat Phone #: ###-####. Needs to complete roll blocking and box out electrical panels.
BLD16-01525 BLD-Framing/Rough-in1/17/20171/17/20171/17/2017 3:45:24 PMPPASS
Call 45 mintues to meet // Doug Phone #: ###-####. All issues resolved. ok to sheet rock.
BLD16-01525 BLD-Energy code compliance1/17/20171/17/20171/17/2017 3:44:41 PMPPASS
Call 45 mintues to meet // Doug Phone #: ###-####
BLD16-04362 BLD-Framing/Rough-in1/16/20171/17/20171/17/2017 3:28:24 PMPNR
Phone #: 2085156235 >> Inspection requested via mobile web by Brian Rodriguez . Plumbing rough in has not passed.
MIS17-00013 BLD-Conference1/17/20171/17/20171/17/2017 2:52:40 PMPFAIL
Possible work being done without permits egress window possibly being done (BLD, ELE, MEC and PLM). Noted new windows with different dimensions to meet egress require building permt. Stop work posted.
BLD16-02899 BLD-Framing/Rough-in1/17/20171/17/20171/17/2017 1:36:20 PMPPART
Work in progress on roof sheeting.
BLD16-02899 BLD-Ceiling Grid Inspection1/13/20171/17/20171/17/2017 12:28:51 PMACANC
Herb Phone #: ###-####. Moved to pm.
BLD16-03809 BLD-Framing/Rough-in1/13/20171/17/20171/17/2017 10:38:25 AMAPASS
Jennifer// please call ahead Phone #: ###-####
BLD16-04016 BLD-Final1/13/20171/17/20171/17/2017 10:23:06 AMAFAIL
Call for access code - David Phone #: ###-####. Provide tempered glazing in window were new bathroom has been created. Provide C.O. and smoke detectors on main level. Correction notice issued.
BLD16-01092 BLD-Framing/Rough-in1/17/20171/17/20171/17/2017 9:57:24 AMAPART
Phone #: ###-#### Inspection requested via web by Kevin Honeycutt. 1st. floor interior steel stud framed walls and hardlids ok. Pending M.E.P inspections in the p.m.
MIS17-00010 BLD-Conference1/13/20171/17/20171/17/2017 9:18:00 AMAPASS
CHECK FOR ANY LIFE SAFETY ISSUES.
MIS17-00010 DOC - Permit Finaled1/17/20171/17/20171/17/2017 9:17:52 AMPPASS
No life/safety issues noted. Only minor damage to exterior siding. Also homeowner if replacing, to apply for building permit.
BLD15-02330 BLD-Final1/13/20171/17/20171/17/2017 9:01:22 AMANR
brian Phone #: ###-####. HAs a mech. permit that has expired. Needs a mech final first. Called number above to let them know.
BLD16-03819 BLD-Final1/15/20171/17/20171/17/2017 8:54:36 AMAPART
Phone #: ###-#### Inspection requested via web by Richard Wilson. Needs to install remainder of carpet. Sink exceeds the 34" max height for ADA. Ok for temp. occ.
BLD16-00567 BLD - Request for Extension1/13/20171/17/20171/17/2017 8:17:32 AMAPASS
John Phone #: ###-####. Due to weather conditions, needs extension.
BLD16-02020 BLD-Footing1/13/20171/17/20171/17/2017 8:06:49 AMACANC
Request call ahead for access, for rebar/footings - Bill Phone #: ###-####