Inspections for the day of: Friday, January 18, 2019.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-03232 BLD-Final1/18/20191/18/20191/18/2019 3:58:03 PMPNR
Laura Phone #: ###-####793
MIS19-00001 BLD-Conference1/15/20191/18/20191/18/2019 2:42:36 PMADEFR
Post CN to obtain a Certificate of Occupancy
BLD19-00006 BLD-Conference1/17/20191/18/20191/18/2019 2:06:31 PMPDONE
Adam Jr Phone #: ###-####
BLD19-00006 DOC - Permit Finaled1/18/20191/18/20191/18/2019 2:06:23 PMPPASS
BLD18-03625 BLD-Energy code compliance1/18/20191/18/20191/18/2019 1:58:13 PMPPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD18-03625 BLD-Framing/Rough-in1/18/20191/18/20191/18/2019 1:58:03 PMPPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD18-03999 BLD-Final1/17/20191/18/20191/18/2019 11:33:31 AMANR
Phone #: ###-#### Inspection requested via web by Timothy Gammill. Needs electrical final first.
BLD18-01121 BLD-Foundation1/17/20191/18/20191/18/2019 11:32:54 AMAPASS
Eric Phone #: ###-####. Vertical steel added at #4 @32"o.c. with 2 #4's at top of stemwall.
BLD17-03890 BLD-Final1/17/20191/18/20191/18/2019 10:59:43 AMAFAIL
Phone #: ###-#### Inspection requested via web by James Jackson. Provide handrail at main entry exterior stairs.
BLD18-04230 BLD-Final1/17/20191/18/20191/18/2019 10:33:05 AMADONE
Phone #: ###-#### Inspection requested via web by Leslee Shuter. All work appeared to be done in accordance with local codes and ordinances.
BLD18-04230 DOC - Permit Finaled1/18/20191/18/20191/18/2019 10:32:38 AMPPASS
BLD18-01425 BLD-Framing/Rough-in1/17/20191/18/20191/18/2019 10:19:01 AMAPASS
James Phone #: ###-####. Interior steel stud framed walls (sound walls and smoke partitions) at area A only ok to one side.
BLD18-02176 BLD-Footing1/16/20191/18/20191/18/2019 9:21:33 AMAPART
Early AM please Phone #: ###-#### Inspection requested via web by Steve Mitchell. column pedestals and frost wall on gridline 1. Column pad footings on gridline 6. Work in progress, special inspector on site. Noted cold weather conc. practices being followed.
BLD18-03628 BLD-Wall Bracing1/17/20191/18/20191/18/2019 8:51:27 AMAPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle