BLD19-00090
| BLD-Final | 1/23/2019 | 1/23/2019 | 1/23/2019 4:36:05 PM | P | PASS |
|
|
Matt Phone #: ###-####.
|
BLD18-02743
| BLD-Framing/Rough-in | 1/22/2019 | 1/23/2019 | 1/23/2019 4:18:48 PM | P | PASS |
|
|
Jesiah Phone #: ###-####
|
BLD18-01779
| BLD-Conference | 1/23/2019 | 1/23/2019 | 1/23/2019 3:57:45 PM | P | DONE |
|
|
Please call Darius. Phone #: ###-#### Inspection requested via web by Ami Ostrow
|
BLD17-04482
| BLD-Final | 1/23/2019 | 1/23/2019 | 1/23/2019 3:40:26 PM | P | PASS |
|
|
Please call Darius Phone #: ###-#### Inspection requested via web by Ami Ostrow. OK for perm occ.
|
BLD18-04023
| BLD-Framing/Rough-in | 1/23/2019 | 1/23/2019 | 1/23/2019 3:04:18 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch. Install all missing straps on portal frames. Install additional 2x6 studs under C01 3 ply at bearing point. Install the SDS screws on the 3ply C01 truss as shown on the truss engineering. Ok to insulate.
|
BLD17-03345
| BLD-Framing/Rough-in | 1/23/2019 | 1/23/2019 | 1/23/2019 2:24:10 PM | P | PASS |
|
|
Jason Phone #: ###-####. Hold downs, 2nd. floor.
|
BLD19-00149
| BLD-Final | 1/18/2019 | 1/23/2019 | 1/23/2019 1:50:02 PM | P | PASS |
|
|
Brian Phone #: ###-####. Ok for perm occ.
|
BLD19-00149
| FIRE-Final Inspection | 1/23/2019 | 1/23/2019 | 1/23/2019 1:49:47 PM | P | PASS |
|
|
Brian Phone #: ###-####
|
BLD18-03562
| BLD-Footing | 1/22/2019 | 1/23/2019 | 1/23/2019 11:13:57 AM | A | NR |
|
|
Tim Phone #: ###-####. Needs geo tech report. Per Josh Bogle, plans do not have any footings in scope of work.
|
BLD18-02185
| BLD-Wall Bracing | 1/22/2019 | 1/23/2019 | 1/23/2019 11:12:59 AM | A | CANC |
|
|
Kevin Phone #: ###-####
|
BLD18-02185
| BLD-Foundation | 1/23/2019 | 1/23/2019 | 1/23/2019 11:12:53 AM | A | PASS |
|
|
Kevin Phone #: ###-####
|
BLD18-03600
| BLD-Framing/Rough-in | 1/22/2019 | 1/23/2019 | 1/23/2019 10:40:45 AM | A | PART |
|
|
Taylor Phone #: ###-####. Ok to one side walls. Needs to complete fire caulking on through penetrations in floor. Ok to insulate and install base layer on 2hr. fire wall.
|
BLD17-04219
| BLD-Foundation | 1/22/2019 | 1/23/2019 | 1/23/2019 9:53:56 AM | A | NR |
|
|
Cameron Phone #: ###-####. Needs public works subgrade approval first.
|
BLD18-03514
| BLD-Conference | 1/22/2019 | 1/23/2019 | 1/23/2019 9:46:10 AM | A | FAIL |
|
|
Nate Phone #: ###-####. Contractor to provide a listed assembly to reflect the as built condition. The as built 2hr. fire wall does not match the approved plans.
|
BLD18-03251
| BLD-Other | 1/22/2019 | 1/23/2019 | 1/23/2019 9:18:16 AM | A | DEFR |
|
|
Structural Steel on B line of building. Phone #: ###-#### Inspection requested via web by Jimmie Miller. Welding, ok to frame and sheet one side only after special inspection has taken place on welds.
|
BLD18-02176
| BLD-Foundation | 1/21/2019 | 1/23/2019 | 1/23/2019 9:08:28 AM | A | CANC |
|
|
we would like as early as we can thanks Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD18-04246
| BLD-Ceiling Grid Inspection | 1/23/2019 | 1/23/2019 | 1/23/2019 8:58:18 AM | A | PASS |
|
|
|
BLD18-04376
| BLD-Framing/Rough-in | 1/22/2019 | 1/23/2019 | 1/23/2019 8:58:06 AM | A | CANC |
|
|
ceiling framing- call 45 mins ahead- Tony Phone #: ###-####. Wrong permit called in.
|
BLD18-03699
| BLD-Framing/Rough-in | 1/22/2019 | 1/23/2019 | 1/23/2019 8:21:38 AM | A | NR |
|
|
Call 20 minutes ahead // Shawn Phone #: ###-####. Will need to nail on tall walls. Ok to insulate.
|
BLD18-02498
| BLD-Final | 1/22/2019 | 1/23/2019 | 1/23/2019 8:11:07 AM | A | PASS |
|
|
Garret Phone #: ###-####. Per #415, electrical has signed perm. occ. ok for perm occ.
|