Inspections for the day of: Wednesday, January 23, 2019.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-00090 BLD-Final1/23/20191/23/20191/23/2019 4:36:05 PMPPASS
Matt Phone #: ###-####.
BLD18-02743 BLD-Framing/Rough-in1/22/20191/23/20191/23/2019 4:18:48 PMPPASS
Jesiah Phone #: ###-####
BLD18-01779 BLD-Conference1/23/20191/23/20191/23/2019 3:57:45 PMPDONE
Please call Darius. Phone #: ###-#### Inspection requested via web by Ami Ostrow
BLD17-04482 BLD-Final1/23/20191/23/20191/23/2019 3:40:26 PMPPASS
Please call Darius Phone #: ###-#### Inspection requested via web by Ami Ostrow. OK for perm occ.
BLD18-04023 BLD-Framing/Rough-in1/23/20191/23/20191/23/2019 3:04:18 PMPFAIL
Phone #: ###-#### Inspection requested via web by bryan murdoch. Install all missing straps on portal frames. Install additional 2x6 studs under C01 3 ply at bearing point. Install the SDS screws on the 3ply C01 truss as shown on the truss engineering. Ok to insulate.
BLD17-03345 BLD-Framing/Rough-in1/23/20191/23/20191/23/2019 2:24:10 PMPPASS
Jason Phone #: ###-####. Hold downs, 2nd. floor.
BLD19-00149 BLD-Final1/18/20191/23/20191/23/2019 1:50:02 PMPPASS
Brian Phone #: ###-####. Ok for perm occ.
BLD19-00149 FIRE-Final Inspection1/23/20191/23/20191/23/2019 1:49:47 PMPPASS
Brian Phone #: ###-####
BLD18-03562 BLD-Footing1/22/20191/23/20191/23/2019 11:13:57 AMANR
Tim Phone #: ###-####. Needs geo tech report. Per Josh Bogle, plans do not have any footings in scope of work.
BLD18-02185 BLD-Wall Bracing1/22/20191/23/20191/23/2019 11:12:59 AMACANC
Kevin Phone #: ###-####
BLD18-02185 BLD-Foundation1/23/20191/23/20191/23/2019 11:12:53 AMAPASS
Kevin Phone #: ###-####
BLD18-03600 BLD-Framing/Rough-in1/22/20191/23/20191/23/2019 10:40:45 AMAPART
Taylor Phone #: ###-####. Ok to one side walls. Needs to complete fire caulking on through penetrations in floor. Ok to insulate and install base layer on 2hr. fire wall.
BLD17-04219 BLD-Foundation1/22/20191/23/20191/23/2019 9:53:56 AMANR
Cameron Phone #: ###-####. Needs public works subgrade approval first.
BLD18-03514 BLD-Conference1/22/20191/23/20191/23/2019 9:46:10 AMAFAIL
Nate Phone #: ###-####. Contractor to provide a listed assembly to reflect the as built condition. The as built 2hr. fire wall does not match the approved plans.
BLD18-03251 BLD-Other1/22/20191/23/20191/23/2019 9:18:16 AMADEFR
Structural Steel on B line of building. Phone #: ###-#### Inspection requested via web by Jimmie Miller. Welding, ok to frame and sheet one side only after special inspection has taken place on welds.
BLD18-02176 BLD-Foundation1/21/20191/23/20191/23/2019 9:08:28 AMACANC
we would like as early as we can thanks Phone #: ###-#### Inspection requested via web by Steve Mitchell
BLD18-04246 BLD-Ceiling Grid Inspection1/23/20191/23/20191/23/2019 8:58:18 AMAPASS
BLD18-04376 BLD-Framing/Rough-in1/22/20191/23/20191/23/2019 8:58:06 AMACANC
ceiling framing- call 45 mins ahead- Tony Phone #: ###-####. Wrong permit called in.
BLD18-03699 BLD-Framing/Rough-in1/22/20191/23/20191/23/2019 8:21:38 AMANR
Call 20 minutes ahead // Shawn Phone #: ###-####. Will need to nail on tall walls. Ok to insulate.
BLD18-02498 BLD-Final1/22/20191/23/20191/23/2019 8:11:07 AMAPASS
Garret Phone #: ###-####. Per #415, electrical has signed perm. occ. ok for perm occ.