Inspections for the day of: Monday, January 27, 2020.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-03933 BLD-Energy code compliance1/24/20201/27/20201/27/2020 3:58:05 PMPNR
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD18-04521 BLD-Energy code compliance1/27/20201/27/20201/27/2020 3:34:16 PMPPASS
Building 12 - 1st Floor, Insulation, Vapor Barrier ; RC Channel inspection. Phone #: ###-#### Inspection requested via web by Bob Goodwin
BLD19-02672 BLD-Final1/27/20201/27/20201/27/2020 3:34:02 PMPFAIL
Tyler- please call for access Phone #: ###-####. Complete blower door test and provide tempered glazing at master window.
BLD19-04287 BLD-Conference1/24/20201/27/20201/27/2020 2:04:26 PMPDONE
This is my first building in Boise, and I would like a quick break down of the inspections required. Phone #: ###-#### Inspection requested via web by Krista Caldwell. Reviewed required inspections and informed Kristi that property pins for lot are required.
BLD19-04287 BLD-Foundation1/24/20201/27/20201/27/2020 2:03:26 PMPCANC
If you need me to be onsite. Please give me a call 1 hour prior.

Thank you Phone #: ###-#### Inspection requested via web by Krista Caldwell
BLD19-04287 BLD-Footing1/27/20201/27/20201/27/2020 2:03:15 PMPPART
If you need me to be onsite. Please give me a call 1 hour prior.

Thank you Phone #: ###-#### Inspection requested via web by Krista Caldwell. Contacted Krista Caldwell at provided number. Needs to have surveyor come out and provide pins for property lines.
BLD19-03085 BLD-Wall cover1/27/20201/27/20201/27/2020 2:00:52 PMPPASS
Larry - soffit inspection Phone #: ###-####
BLD18-03663 BLD-Framing/Rough-in1/27/20201/27/20201/27/2020 2:00:10 PMPPART
James Phone #: ###-####. Conferance on sofit detail. Ok to sheet with OSB and install 5/8 type X rock and offset joints. will call for inspection after install of 5/8.
BLD19-04869 BLD-Conference1/24/20201/27/20201/27/2020 11:05:13 AMADONE
ben Phone #: ###-####. will be ok for final after fire/life/safety has finaled.
BLD19-04769 BLD-Conference1/24/20201/27/20201/27/2020 9:25:11 AMADONE
ben Phone #: ###-####. Will be ok for final once fire/life/safety finals.
BLD19-00698 BLD-Framing/Rough-in1/26/20201/27/20201/27/2020 8:39:56 AMAPASS
Call with any questions. Thanks! Phone #: ###-#### Inspection requested via web by Rachael Moore. All issues resolved. ok to cover.
BLD20-00046 BLD-Footing1/24/20201/27/20201/27/2020 8:27:59 AMANR
Victor Phone #: ###-####. Excavation full of water.
BLD20-00046 BLD-Footing1/24/20201/27/20201/27/2020 8:27:31 AMANR
Victor Phone #: ###-####. Excavation full of water.
BLD20-00047 BLD-Footing1/24/20201/27/20201/27/2020 8:26:59 AMANR
Victor Phone #: ###-####. Excavation full of water.