Inspections for the day of: Friday, January 5, 2018.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-03967 BLD-Footing1/4/20181/5/20181/5/2018 3:35:32 PMPPASS
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
BLD17-03968 BLD-Footing1/4/20181/5/20181/5/2018 3:35:22 PMPPASS
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
BLD17-04212 BLD-Foundation1/4/20181/5/20181/5/2018 3:35:10 PMPPART
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
BLD17-03986 BLD-Foundation1/4/20181/5/20181/5/2018 3:34:59 PMPPART
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
BLD17-00268 BLD-Final1/5/20181/5/20181/5/2018 2:39:51 PMPPASS
Cory Phone #: ###-####
BLD17-04191 BLD-Framing/Rough-in1/5/20181/5/20181/5/2018 2:04:39 PMPPASS
If front door locked, keypad to right of door. CODE: 1912# Phone #: ###-#### Inspection requested via web by Brandon Schmeckpeper. Interior steel stud framed walls, 1st. floor only ok.
BLD16-04464 BLD-Other1/5/20181/5/20181/5/2018 1:26:11 PMPPASS
Sam-fire rated assembly Phone #: ###-####. 2 layers 5/8 type x at soffit ok.
BLD17-03734 BLD-Framing/Rough-in1/4/20181/5/20181/5/2018 12:00:26 PMAFAIL
Phone #: ###-#### Inspection requested via web by Tom Wells. Plumbing rough in inspection failed. Install the additional SDS screws on LVL's as shown on approved plans Provide additional studs, both ends of FG01 2ply truss. Roll block floor joist at cantilever on garage wall. provide blocking on interior shaer wall, 2nd floor, by stairs. Justify pluming penetrations on fllor joist at garage and above bathroom by stairs.9 Only pre punch allowed with in six inches at end of floor joist. Install the floor to floor holdown as shown on the plans. Correction notice posted.
BLD17-03969 BLD-Framing/Rough-in1/4/20181/5/20181/5/2018 11:55:24 AMANR
After 10 am please. Phone #: ###-#### Inspection requested via web by Tom Wells. Needs plumbing rough in inspection.
BLD17-01166 BLD-Final1/4/20181/5/20181/5/2018 10:46:48 AMAPART
part final- Cecil Phone #: ###-####. Rooms 209 and 210 ok to occupy.
BLD17-04006 BLD-Final1/4/20181/5/20181/5/2018 10:20:07 AMAPASS
call on your way - DJ Phone #: ###-####
BLD17-04006 DOC - Permit Finaled1/5/20181/5/20181/5/2018 10:19:59 AMPPASS
BLD17-02429 BLD-Footing1/4/20181/5/20181/5/2018 10:02:30 AMAPASS
Concrete is scheduled for 11am Phone #: ###-#### Inspection requested via web by Marty Short
BLD17-02707 BLD-Final1/4/20181/5/20181/5/2018 9:23:44 AMAPASS
Tim Phone #: ###-####. All issues were resolved. Ok for perm occ.
BLD17-03755 BLD-Framing/Rough-in1/4/20181/5/20181/5/2018 8:55:55 AMAPART
Contact is JP ###-#### Phone #: ###-#### Inspection requested via web by Mattie Botero. Interior wood framed walls and soffits for phase 2 ok, pend. electrical rough in inspection.
BLD17-00554 BLD-Framing/Rough-in1/4/20181/5/20181/5/2018 8:36:41 AMAPASS
Thanks. Scott Phone #: ###-#### Inspection requested via web by Scott Zierler
BLD17-00554 BLD-Energy code compliance1/5/20181/5/20181/5/2018 8:36:33 AMAPASS
Thanks. Scott Phone #: ###-#### Inspection requested via web by Scott Zierler
BLD17-04513 BLD-Final1/2/20181/5/20181/5/2018 12:00:00 AMACANC
Enter through back parking lot- Larren Phone #: ###-####