Inspections for the day of: Monday, October 14, 2019.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-02011 BLD-Foundation10/11/201910/14/201910/14/2019 4:14:52 PMPPASS
wall //dane Phone #: ###-####
BLD19-01729 BLD-Foundation10/11/201910/14/201910/14/2019 4:14:37 PMPPASS
dANE- FOUNDATION WALL Phone #: ###-####
BLD19-03227 BLD-Wall Bracing10/14/201910/14/201910/14/2019 3:19:46 PMPFAIL
Gari Phone #: ###-####. Install missing MSTC straps on exterior of RV bay opening. Install all missed blocking and nail. Provide engineering for fix on missing STDH-14 straps and bolts for hold downs.
BLD19-03790 BLD-Framing/Rough-in10/14/201910/14/201910/14/2019 2:46:34 PMPPASS
Dusty Phone #: ###-####. Interior steel stud framed walls for two new offices only ok.
BLD18-04294 BLD-Footing10/11/201910/14/201910/14/2019 2:26:34 PMPPASS
Concrete is scheduled for 2:00 pm Phone #: ###-#### Inspection requested via web by Roger Graves
BLD19-01498 BLD-Energy code compliance10/14/201910/14/201910/14/2019 1:30:42 PMPPASS
Shawn Phone #: ###-####
BLD19-01141 BLD-Framing/Rough-in10/10/201910/14/201910/14/2019 11:38:04 AMADEFR
masion- Alex Phone #: ###-####. Ok pending special inspection.
BLD18-03200 BLD-Final10/11/201910/14/201910/14/2019 11:37:37 AMANR
tONY Phone #: ###-####. Needs public works final.
BLD18-04286 BLD-Framing/Rough-in10/11/201910/14/201910/14/2019 9:44:31 AMAPASS
fire wall inspection building one south end Phone #: ###-#### Inspection requested via web by Glen Farrell
BLD19-01682 BLD-Framing/Rough-in10/14/201910/14/201910/14/2019 9:23:11 AMAFAIL
Call Shawn prior. 2088013772 Phone #: ###-#### Inspection requested via web by Shawn Plimmer. Provide additional studs under 2 and 3 ply girder trusses. Nail off girder trusses per the engineering. fire block concealed space at roof drain. Ok to insulate.
BLD19-01233 BLD-Final10/11/201910/14/201910/11/2019 5:15:42 PMPCANC
Preferably before school opens if plan review is completed. Phone #: ###-#### >> Inspection requested via web by Jimmie Miller Inspection cancelled from web by: Jackie Phelps