BLD16-04506
| BLD-Foundation | 10/2/2017 | 10/2/2017 | 10/2/2017 3:52:55 PM | P | PASS |
|
|
Insulation // Sam Phone #: ###-####
|
BLD16-04507
| BLD-Foundation | 10/2/2017 | 10/2/2017 | 10/2/2017 3:52:38 PM | P | PASS |
|
|
Insulation // Sam Phone #: ###-####
|
BLD16-02745
| BLD-Wall Bracing | 10/2/2017 | 10/2/2017 | 10/2/2017 3:52:29 PM | P | PASS |
|
|
Shear // Sam Phone #: ###-####
|
BLD16-04489
| BLD-Foundation | 10/2/2017 | 10/2/2017 | 10/2/2017 3:52:18 PM | P | PASS |
|
|
Insulation // Sam Phone #: ###-####
|
BLD16-04490
| BLD-Foundation | 10/2/2017 | 10/2/2017 | 10/2/2017 3:52:07 PM | P | PASS |
|
|
Insulation // Sam Phone #: ###-####
|
BLD16-04467
| BLD-Foundation | 10/2/2017 | 10/2/2017 | 10/2/2017 3:51:56 PM | P | PASS |
|
|
Rebar // Sam Phone #: ###-####
|
BLD16-04461
| BLD-Foundation | 10/2/2017 | 10/2/2017 | 10/2/2017 3:51:46 PM | P | PASS |
|
|
Rebar // Sam Phone #: ###-####
|
BLD16-04462
| BLD-Foundation | 10/2/2017 | 10/2/2017 | 10/2/2017 3:51:36 PM | P | PASS |
|
|
Rebar // Sam Phone #: ###-####
|
BLD16-04464
| BLD-Foundation | 10/2/2017 | 10/2/2017 | 10/2/2017 3:51:26 PM | P | PASS |
|
|
Rebar // Sam Phone #: ###-####
|
BLD16-04446
| BLD-Foundation | 10/2/2017 | 10/2/2017 | 10/2/2017 3:51:14 PM | P | PASS |
|
|
Rebar // Sam Phone #: ###-####
|
BLD16-04313
| BLD-Energy code compliance | 10/2/2017 | 10/2/2017 | 10/2/2017 2:58:36 PM | P | NR |
|
|
David Phone #: ###-####
|
BLD16-04314
| BLD-Energy code compliance | 10/2/2017 | 10/2/2017 | 10/2/2017 2:58:23 PM | P | NR |
|
|
David Phone #: ###-####
|
BLD17-01248
| BLD-Framing/Rough-in | 10/2/2017 | 10/2/2017 | 10/2/2017 1:44:47 PM | P | FAIL |
|
|
Electrical Inspection is this afternoon as well.... we need okay to insulate tomorrow Phone #: ###-#### Inspection requested via web by Andrew Clark. Complete airseal after electrical rough in inspection. Nail off 3 ply truss per enginering.Lateral bracing on A2 truss placed at wrong location. Nail off all simpson hangars. Provide headers in doors @ existing exterior wall and install h2.5 on existing truss to wall. Strap top plates from addition to existing top plates. Strap top plates on interior wall at 3ply point load to adjacent wall. Provide continous bearing from 3ply point load to footing. Provide smoke detectors in exisitng bedrooms, hardwired and interconnected. Correction notice posted.
|
BLD17-02862
| BLD-Footing | 9/29/2017 | 10/2/2017 | 10/2/2017 10:13:33 AM | A | PART |
|
|
Jeremy Phone #: ###-####. Will call in for wall inspection. will be mono placement.
|
MIS16-00038
| MIS-Aging Inspection | 10/2/2017 | 10/2/2017 | 10/2/2017 10:06:01 AM | | PASS |
|
|
|
MIS16-00038
| DOC - Permit Finaled | 10/2/2017 | 10/2/2017 | 10/2/2017 10:05:51 AM | P | PASS |
|
|
A permit has been issued and finaled.
|
BLD17-01656
| BLD-Framing/Rough-in | 9/29/2017 | 10/2/2017 | 10/2/2017 9:44:44 AM | A | PASS |
|
|
Matt-phase 1-Matt said this inspection doesn't have anything to do with the plan mod Phone #: ###-####. Interior steel stud framed walls and wood I-joist ok, phase 1.
|
BLD16-02745
| BLD-Wall Bracing | 9/29/2017 | 10/2/2017 | 10/2/2017 8:46:56 AM | A | FAIL |
|
|
Sam Phone #: ###-####. Missing blocking, floor to floor straps and noted that not all holdowns are installed.
|