Inspections for the day of: Monday, October 21, 2019.
Number of inspections: 27
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-02806 BLD-Other10/17/201910/21/201910/21/2019 4:39:32 PMAPEND
Any thing left? Can permit be finaled? Appears that parking lot improvement to happen this spring. A grading permit is ready to be picked up.
BLD19-02012 BLD-Footing10/18/201910/21/201910/21/2019 4:27:02 PMPNR
Jerrry Phone #: ###-####
BLD19-03790 BLD-Final10/17/201910/21/201910/21/2019 4:25:49 PMAPASS
Terry Phone #: ###-####. Ok for perm occ.
ESC19-00527 Site Final10/21/201910/21/201910/21/2019 4:21:14 PMPDONE
ESC19-00527 DOC - Permit Finaled10/21/201910/21/201910/21/2019 4:21:05 PMPPASS
BLD19-01484 BLD-Final10/21/201910/21/201910/21/2019 4:20:54 PMPPASS
garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD19-01484 DOC - Permit Finaled10/21/201910/21/201910/21/2019 4:20:53 PMPPASS
BLD19-02328 BLD-Energy code compliance10/21/201910/21/201910/21/2019 4:00:54 PMPPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD19-02013 BLD-Footing10/18/201910/21/201910/21/2019 4:00:42 PMPPASS
Jerrry Phone #: ###-####
BLD19-04025 BLD-Other10/18/201910/21/201910/21/2019 4:00:42 PMPPASS
SHAWN- SIDING INSPECTION Phone #: ###-####
BLD19-02440 BLD-Ceiling Grid Inspection10/21/201910/21/201910/21/2019 3:19:46 PMPNR
Mike,

We r good to go for your grid inspection. Thanks, todd Phone #: ###-#### Inspection requested via web by Todd Kurns. Needs electrical and mech. rough in inspections above grid first.
BLD18-04521 BLD-Framing/Rough-in10/18/201910/21/201910/21/2019 3:10:30 PMPFAIL
First Floor Shear Inspection Phone #: ###-#### Inspection requested via web by Kris Linnell. 1st floor shear, missing fateners and holddowns.
BLD19-02010 BLD-Framing/Rough-in10/21/201910/21/201910/21/2019 2:07:31 PMPFAIL
Complete lateral bracing on A3 trusses. Complete fireblocking on furdowns. Nail off all simpson hangars and provide fixes for trusses at entry way. Ok to insulate.
BLD19-02007 BLD-Framing/Rough-in10/21/201910/21/201910/21/2019 2:07:11 PMPFAIL
Complete lateral bracing on A3 trusses. Complete fireblocking on furdowns. Nail off all simpson hangars and provide fixes for trusses at entry way. Ok to insulate.
BLD19-03753 BLD-Foundation10/18/201910/21/201910/21/2019 1:34:25 PMPPART
Jerrry Phone #: ###-####
BLD18-04318 BLD-Conference10/21/201910/21/201910/21/2019 1:34:05 PMPDONE
Josh Phone #: ###-####. A correction notice was issued to provide two wires on opposing sides to installed light fixtures in grid and attach to structure above.
BLD19-02955 BLD-Other10/18/201910/21/201910/21/2019 10:10:04 AMAPASS
Block and Tie- Randy Phone #: ###-####
BLD19-02953 BLD-Other10/18/201910/21/201910/21/2019 10:06:04 AMAPASS
Block and Tie- Randy Phone #: ###-####
BLD19-01233 BLD-Final10/18/201910/21/201910/21/2019 9:47:01 AMAPASS
Can we please final our life fire safety now that the FA permit FIR19-00585 is finaled (revised drawings approved). Thank you. Phone #: ###-#### Inspection requested via web by Jackie Phelps
BLD19-01233 DOC - Permit Finaled10/21/201910/21/201910/21/2019 9:46:53 AMPPASS
ESC19-00649 Site Final10/21/201910/21/201910/21/2019 9:13:39 AMADONE
ESC19-00649 DOC - Permit Finaled10/21/201910/21/201910/21/2019 9:13:32 AMPPASS
BLD19-01783 BLD-Final10/18/201910/21/201910/21/2019 9:13:18 AMAPASS
dotty- please call access Phone #: ###-####
BLD19-01783 DOC - Permit Finaled10/21/201910/21/201910/21/2019 9:13:10 AMPPASS
BLD19-01783 BLD-Blower Door Test Results10/21/201910/21/201910/21/2019 9:12:24 AMADONE
3.3
BLD19-02007 BLD-Framing/Rough-in10/18/201910/21/201910/21/2019 8:29:34 AMACANC
JIM Phone #: ###-####. Moved to pm inspection.
BLD19-02010 BLD-Framing/Rough-in10/18/201910/21/201910/21/2019 8:29:13 AMACANC
JIM Phone #: ###-####. moved to pm inspection.