Inspections for the day of: Monday, October 23, 2017.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-03045 BLD-Conference10/23/201710/23/201710/23/2017 5:16:44 PMPDONE
Noted that barber college was operating with no cert. of occupancy. Fire/life/safety inspection failed, per fire corrections additional horn strobes need to be added and a fire sprinkler head is over spaced. No temp. occupancy has been given by fire inspector. It appears that a fire alarm permit has been issued and treasure valley fire is doing the sprinkler work per the tenant. A correction notice was issued stating that no occupancy is allowed until all fire issues have been resolved and building final has been scheduled and inspected. Did note that the tenant did have a sign at main entry stating that the college was closed until this wednesday.
BLD17-00273 BLD-Framing/Rough-in10/23/201710/23/201710/23/2017 5:02:19 PMPDEFR
Cody Phone #: ###-####. No time.
BLD17-03466 BLD-Final10/23/201710/23/201710/23/2017 4:29:43 PMPPASS
Daniel Phone #: ###-####. Oki for perm occ.
BLD17-02849 BLD-Footing10/22/201710/23/201710/23/2017 4:22:06 PMPPART
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo. Due to side set backs, contractor is unaware of impact to existing unit that will require 1hr. eave protection and no openings. Footing ok.
BLD16-04311 BLD-Energy code compliance10/22/201710/23/201710/23/2017 4:20:38 PMPCANC
Please do inspection after lunch time, being insulated in AM, Thanks! Phone #: ###-#### Inspection requested via web by david scaggs
BLD16-04311 BLD-Framing/Rough-in10/23/201710/23/201710/23/2017 4:20:32 PMPFAIL
Please do inspection after lunch time, being insulated in AM, Thanks! Phone #: ###-#### Inspection requested via web by david scaggs. Frame in dryer vents in units 101 and 103 upstairs and fireblock at ceiling level. complete lateral bracing on C02 trusses in unit 104 and 102. Also provide addtional lateral bracing on top chords of C02 truses in unit 102 were roff sheathing has been left short. Correction notice posted. Ok to insulate.
BLD16-04253 BLD-Conference10/20/201710/23/201710/23/2017 3:45:58 PMPDONE
Phone #: ###-#### Inspection requested via web by Darius Saxton
BLD17-03259 BLD-Footing10/20/201710/23/201710/23/2017 3:19:24 PMPPASS
Sabastion Phone #: ###-####
BLD17-03479 BLD-Footing10/23/201710/23/201710/23/2017 2:57:20 PMPPASS
Gregg Phone #: ###-####
BLD17-02066 BLD-Energy code compliance10/20/201710/23/201710/23/2017 2:32:37 PMPCANC
Inspection requested via web by Joel Hirtle
BLD17-02066 BLD-Framing/Rough-in10/20/201710/23/201710/23/2017 2:32:21 PMPFAIL
Inspection requested via web by Joel Hirtle. Install the 2x10 scab for BG2 box truss as shown on truss enginering. No wall bracing inspection. Remove tyvek for wall bracing inspection. Correction notice posted. Ok to insulate.
BLD16-04501 BLD-Foundation10/23/201710/23/201710/23/2017 1:40:09 PMPPASS
Sam Phone #: ###-####. Rigid insualtion on stemwall under slab on grade.
BLD16-04502 BLD-Foundation10/23/201710/23/201710/23/2017 1:39:52 PMPPASS
Sam Phone #: ###-####. Rigid insualtion on stemwall under slab on grade.
BLD16-04499 BLD-Foundation10/23/201710/23/201710/23/2017 1:39:34 PMPPASS
Sam Phone #: ###-####. Rigid insualtion on stemwall under slab on grade.
BLD16-04498 BLD-Foundation10/23/201710/23/201710/23/2017 1:39:18 PMPPASS
Sam Phone #: ###-####. Rigid insualtion on stemwall under slab on grade.
BLD16-04509 BLD-Footing10/23/201710/23/201710/23/2017 1:38:39 PMPPASS
Manual Phone #: ###-####
BLD16-04510 BLD-Footing10/23/201710/23/201710/23/2017 1:38:22 PMPPASS
Manual Phone #: ###-####
BLD17-03159 BLD-Footing10/23/201710/23/201710/23/2017 11:54:28 AMAPART
As early as possible Phone #: 2086956570 >> Inspection requested via mobile web by Matt Swenson. No approved plans on site. Footing construction appears ok. Called number above and left message. No call back. Contractor may proceed at his own risk, can check setbacks on foundation wall inspection.
BLD16-04363 BLD-Aging Inspection10/23/201710/23/201710/23/2017 10:47:21 AM CANC
BLD16-02806 BLD-Foundation10/23/201710/23/201710/23/2017 10:24:17 AMPCANC
Stem wall & bar inspect for late PM pour. Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm Inspection cancelled from web by: Ryan Wilhelm
BLD17-03416 BLD-Footing10/20/201710/23/201710/23/2017 10:03:02 AMANR
jeremy Phone #: ###-####
BLD17-00339 BLD-Other10/18/201710/23/201710/23/2017 9:36:44 AMAPART
floor placement // Ross Phone #: ###-####. Welded wire mesh for slab on grade, west half of building. Will install concrete dobi's prior to placement. Will have specil inspection.
BLD17-02231 BLD-Framing/Rough-in10/20/201710/23/201710/23/2017 8:55:09 AMAPASS
Darius Phone #: ###-####. Ok to insulate.
BLD17-00273 BLD-Framing/Rough-in10/19/201710/23/201710/23/2017 12:00:00 AMPDONE
Cody Phone #: ###-####