Inspections for the day of: Tuesday, October 23, 2018.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-03880 BLD-Final10/22/201810/23/201810/23/2018 3:55:01 PMPCANC
Robert Phone #: ###-####. Cancelled per contractor via phone call.
BLD18-02557 BLD-Framing/Rough-in10/22/201810/23/201810/23/2018 2:54:12 PMPPASS
Chris Phone #: ###-####. Interior steel stud framed walls only ok.
BLD18-02364 BLD-Framing/Rough-in10/23/201810/23/201810/23/2018 2:10:58 PMPPASS
Phone #: ###-#### Inspection requested via web by Michael King
BLD18-03288 BLD-Ceiling Grid Inspection10/22/201810/23/201810/23/2018 1:46:55 PMPPASS
Tom ( no ph#) he will be there... call the office if problems ###-####. PAtch back ok.
BLD18-01669 BLD-Wall Bracing10/23/201810/23/201810/23/2018 1:33:24 PMPPASS
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD18-01668 BLD-Wall Bracing10/23/201810/23/201810/23/2018 1:33:08 PMPPASS
Phone #: ###-#### Inspection requested via web by Sam Brown
BLD18-03425 BLD-Conference10/19/201810/23/201810/23/2018 11:09:02 AMADONE
Mathew-if foundation inspection passes can you doc final permit? BLD18-03141 has been issued Phone #: ###-####
BLD18-01760 BLD-Ceiling Grid Inspection10/22/201810/23/201810/23/2018 10:52:31 AMANR
Please call Derek or Zach 30 Minutes prior to arriving.

Thank You, Phone #: ###-#### Inspection requested via web by Ron Oswald. No call back and no access to jobsite. Will need to reschedule.
BLD17-04465 BLD-Wall Bracing10/22/201810/23/201810/23/2018 10:36:12 AMAFAIL
Exterior Shear inspection on south and east walls
Phone #: ###-#### Inspection requested via web by Hunter Gomez. east wall, 2nd floor, needs fasteners at 3 inches o.c..
BLD18-01191 BLD-Energy code compliance10/22/201810/23/201810/23/2018 10:00:36 AMAPASS
Requesting and insulation inspection on the south, east upper west ; upper north gym walls. Thank you. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD18-03873 BLD-Footing10/22/201810/23/201810/23/2018 9:29:43 AMANR
Call half hour before // Basileo Phone #: ###-####
BLD18-00455 BLD-Framing/Rough-in10/22/201810/23/201810/23/2018 9:02:19 AMAPASS
James Phone #: ###-####
BLD16-04511 BLD-Final10/23/201810/23/201810/23/2018 8:51:52 AMPCANC
Phone #: ###-#### >> Inspection requested via web by Sam Brown Inspection cancelled from web by: Sam Brown