MIS17-00353
| BLD-Conference | 10/19/2017 | 10/26/2017 | 10/26/2017 4:18:21 PM | A | DONE |
|
|
Verified that a phone call has been made to Carl Madsen on what building owner needs to provide to planning moving foward.
|
BLD16-00414
| BLD-Final | 10/26/2017 | 10/26/2017 | 10/26/2017 4:16:36 PM | P | NR |
|
|
Garage code is 0813. Final Elevation cert is on record, approved 9/27/17.
Thanks Scott Phone #: ###-#### Inspection requested via web by Scott Zierler. Will reschedule.
|
BLD16-04316
| BLD-Framing/Rough-in | 10/26/2017 | 10/26/2017 | 10/26/2017 4:16:17 PM | P | CANC |
|
|
|
BLD16-04316
| BLD-Energy code compliance | 10/26/2017 | 10/26/2017 | 10/26/2017 4:16:07 PM | P | PASS |
|
|
|
BLD16-04316
| BLD-Framing/Rough-in | 10/25/2017 | 10/26/2017 | 10/26/2017 4:15:56 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by david scaggs
|
BLD17-02654
| BLD-Energy code compliance | 10/25/2017 | 10/26/2017 | 10/26/2017 2:21:35 PM | P | PASS |
|
|
Steve Phone #: ###-####
|
BLD17-03341
| BLD-Final | 10/25/2017 | 10/26/2017 | 10/26/2017 2:04:28 PM | P | PASS |
|
|
Call customer if needed. He will be home. Call me as well if need be ###-#### Phone #: ###-#### Inspection requested via web by Christian Kilpatrick
|
BLD17-03341
| DOC - Permit Finaled | 10/26/2017 | 10/26/2017 | 10/26/2017 2:04:17 PM | P | PASS |
|
|
|
BLD17-02707
| BLD-Framing/Rough-in | 10/26/2017 | 10/26/2017 | 10/26/2017 1:45:19 PM | P | PART |
|
|
20 mins heads up- Tim Phone #: ###-####. Needs special inspection for welding and installation of new holdowns. Interior steel stud framed walls ok. noted existing wall is a shear wall. Also noted new beams and tube steel columns installed per the engineering to pick up roof load of existing load bearing wall that has been demolished.
|
BLD17-03185
| BLD-Framing/Rough-in | 10/25/2017 | 10/26/2017 | 10/26/2017 11:56:49 AM | P | PART |
|
|
floor framing // Dave Phone #: ###-####
|
BLD17-02688
| BLD-Footing | 10/26/2017 | 10/26/2017 | 10/26/2017 11:56:29 AM | P | FAIL |
|
|
As soon as possible please. Thank you :) Phone #: ###-#### Inspection requested via web by Candyce Moss. Will need to resubmit. Plans not shown were patio cover is going to be installed.
|
BLD16-04316
| BLD-Framing/Rough-in | 10/26/2017 | 10/26/2017 | 10/26/2017 11:12:32 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by david scaggs . Moved to pm.
|
BLD17-01452
| BLD-Footing | 10/25/2017 | 10/26/2017 | 10/26/2017 10:50:24 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Leonard Butler. Column pad footings for new canopy. No approved plans on site. Will have special inspection. Contractor to have all required documents on site for next inspection.
|
BLD17-03479
| BLD-Foundation | 10/25/2017 | 10/26/2017 | 10/26/2017 10:33:19 AM | A | PASS |
|
|
John Phone #: ###-####. North half ok.
|
BLD17-02141
| BLD-Energy code compliance | 10/25/2017 | 10/26/2017 | 10/26/2017 10:21:09 AM | A | PASS |
|
|
Rod Phone #: ###-####
|
BLD17-02141
| BLD-Framing/Rough-in | 10/26/2017 | 10/26/2017 | 10/26/2017 10:20:59 AM | P | PASS |
|
|
Rod Phone #: ###-####. previous framing issues resolved. Exterior walls, and roof system ok to cover.
|
BLD17-02863
| BLD-Final | 10/25/2017 | 10/26/2017 | 10/26/2017 9:48:14 AM | A | FAIL |
|
|
Call for code - Rob Phone #: ###-####. Provide 20 min. rated door at garage to mudroom. Correction notice issued.
|
BLD17-01656
| BLD-Footing | 10/25/2017 | 10/26/2017 | 10/26/2017 9:30:24 AM | A | PART |
|
|
Matt Phone #: ###-####. Interior footing for new shear wall. Rebar cage was placed at and angle due to pre existting concrete under slab. Contractor to get RFI for fix or to leave as is.
|
BLD17-00273
| BLD-Framing/Rough-in | 10/25/2017 | 10/26/2017 | 10/26/2017 9:06:02 AM | A | PART |
|
|
Cody Phone #: ###-####. Ok to insulate pending electrical rough in inspection.
|
BLD17-03338
| BLD-Concrete | 10/25/2017 | 10/26/2017 | 10/26/2017 8:49:42 AM | A | PART |
|
|
As early as possible Phone #: 2088305327 >> Inspection requested via mobile web by Ed sloan. Work in progress on south footing line and middle footing. Ok pending special inspection.
|