BLD19-01486
| BLD-Wall Bracing | 10/28/2019 | 10/29/2019 | 10/29/2019 4:18:41 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD19-02676
| BLD-Final | 10/29/2019 | 10/29/2019 | 10/29/2019 3:03:39 PM | P | PASS |
|
|
Please call if you have any questions. Phone #: ###-#### Inspection requested via web by Todd Morrison
|
BLD19-02676
| DOC - Permit Finaled | 10/29/2019 | 10/29/2019 | 10/29/2019 3:03:38 PM | P | PASS |
|
|
|
BLD19-02876
| BLD-Final | 10/29/2019 | 10/29/2019 | 10/29/2019 2:34:40 PM | P | PASS |
|
|
plans and permit are inside unit. Phone #: ###-#### Inspection requested via web by Todd Landvatter
|
BLD19-03643
| BLD-Footing | 10/28/2019 | 10/29/2019 | 10/29/2019 1:28:14 PM | P | PASS |
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru
|
MIS19-00337
| BLD-Conference | 10/15/2019 | 10/29/2019 | 10/29/2019 12:45:50 PM | A | DONE |
|
|
Check on status... Spoke to Dave with Zer0rez carpet cleaning. (###-####). Noted he is working on getting plans from sundance and calcs for racking from materials handling.
|
BLD19-01682
| BLD-Other | 10/29/2019 | 10/29/2019 | 10/29/2019 11:20:01 AM | A | PASS |
|
|
Fire wall layer 2 inspection Phone #: ###-#### Inspection requested via web by Shawn Plimmer
|
BLD19-02307
| BLD-Wall Bracing | 10/28/2019 | 10/29/2019 | 10/29/2019 10:57:15 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD19-02238
| BLD-Ceiling Grid Inspection | 10/28/2019 | 10/29/2019 | 10/29/2019 10:26:16 AM | A | PASS |
|
|
Chris Phone #: ###-####
|
BLD19-03111
| BLD-Framing/Rough-in | 10/28/2019 | 10/29/2019 | 10/29/2019 9:46:15 AM | A | FAIL |
|
|
Gari Phone #: ###-####. Repair notched 2x10 for 2nd. floor at tub drain. Provide additional stud under T7 2 ply truss. Nail webs on 2ply T10 truss per the engineering. Fireblock furred walls at double top plates in hallway @main entry. Can not verify tempered glazing in bathroom. Foam under tub in masterbedroom and pex in bottom plate at master shower. Complete lateral bracing on M11 and M12 trusses. Corection notice posted. ok to insulate.
|