BLD18-03425
| BLD-Foundation | 10/8/2018 | 10/8/2018 | 10/8/2018 4:34:34 PM | P | DEFR |
|
|
Matthew Phone #: ###-####. Concrete was placed in the a.m. Special inspector on site.
|
GRD18-00037
| GRD-Final | 10/8/2018 | 10/8/2018 | 10/8/2018 3:08:41 PM | P | PASS |
|
|
Mike Phone #: ###-####
|
BLD18-03288
| BLD-Framing/Rough-in | 10/5/2018 | 10/8/2018 | 10/8/2018 2:43:41 PM | P | PASS |
|
|
Tom Phone #: ###-####. INterior steel stud framed wall ok.
|
BLD16-04500
| BLD-Final | 10/8/2018 | 10/8/2018 | 10/8/2018 2:23:26 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD16-04500
| DOC - Permit Finaled | 10/8/2018 | 10/8/2018 | 10/8/2018 2:23:18 PM | P | PASS |
|
|
|
BLD16-04492
| BLD-Final | 10/8/2018 | 10/8/2018 | 10/8/2018 2:23:05 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD16-04492
| DOC - Permit Finaled | 10/8/2018 | 10/8/2018 | 10/8/2018 2:22:56 PM | P | PASS |
|
|
Window has been tempered.
|
BLD16-04500
| BLD-Blower Door Test Results | 10/8/2018 | 10/8/2018 | 10/8/2018 2:22:23 PM | P | DONE |
|
|
5.9ACH @50pa
|
BLD16-04502
| BLD-Final | 10/8/2018 | 10/8/2018 | 10/8/2018 2:04:23 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD16-04502
| DOC - Permit Finaled | 10/8/2018 | 10/8/2018 | 10/8/2018 2:04:13 PM | P | PASS |
|
|
|
BLD16-04501
| BLD-Final | 10/8/2018 | 10/8/2018 | 10/8/2018 2:03:54 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD16-04501
| DOC - Permit Finaled | 10/8/2018 | 10/8/2018 | 10/8/2018 2:03:43 PM | P | PASS |
|
|
|
BLD16-04502
| BLD-Blower Door Test Results | 10/8/2018 | 10/8/2018 | 10/8/2018 2:03:30 PM | P | DONE |
|
|
6.0 ACH@ 50pa
|
BLD16-04501
| BLD-Blower Door Test Results | 10/8/2018 | 10/8/2018 | 10/8/2018 1:59:26 PM | P | DONE |
|
|
6.1ACH @50pa
|
BLD18-01173
| BLD-Final | 10/8/2018 | 10/8/2018 | 10/8/2018 1:33:24 PM | P | FAIL |
|
|
door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle. Provide final for fireplace. Provide blower door test report and post results. Provide code compliant handrail at back door. Correction notice posted.
|
BLD18-02322
| BLD-Framing/Rough-in | 10/4/2018 | 10/8/2018 | 10/8/2018 10:26:54 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Jessica Bradley Inspection cancelled from web by: Jessica Bradley
|
BLD18-01779
| BLD-Conference | 10/5/2018 | 10/8/2018 | 10/8/2018 10:13:32 AM | A | PART |
|
|
Call Darius, please. Phone #: ###-#### Inspection requested via web by Ami Tracy. Interior steel stud framed wall for New MRI room. Ok to one side only for install of shielding.
|
BLD18-01390
| BLD-Concrete | 10/5/2018 | 10/8/2018 | 10/8/2018 9:33:14 AM | A | PART |
|
|
drive thru- Sean Phone #: ###-####. Welded wire mesh for exterior concrete slab on grade for drive through. Noted some clearance issues. Contractor to fix prior to concrete placement.
|
BLD18-02651
| BLD-Final | 10/5/2018 | 10/8/2018 | 10/8/2018 8:27:29 AM | A | NH |
|
|
Mark Phone #: ###-####. No access to inside of shed. it is locked.
|