MIS18-00007
| MIS-Aging Inspection | 10/9/2018 | 10/9/2018 | 10/9/2018 3:44:17 PM | | DEFR |
|
|
|
BLD18-03148
| BLD-Final | 10/9/2018 | 10/9/2018 | 10/9/2018 3:43:13 PM | P | NR |
|
|
Plans have been left in the meter box Phone #: ###-#### Inspection requested via web by Ashley White. Needs electrical final first.
|
BLD17-04278
| BLD-Ceiling Grid Inspection | 10/8/2018 | 10/9/2018 | 10/9/2018 2:11:43 PM | P | PASS |
|
|
Jeff Phone #: ###-####. Ceiling grid at new reception area.
|
BLD18-02322
| BLD-Framing/Rough-in | 10/8/2018 | 10/9/2018 | 10/9/2018 1:41:09 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jessica Bradley
|
BLD18-02280
| BLD-Framing/Rough-in | 10/8/2018 | 10/9/2018 | 10/9/2018 11:54:33 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Rustin Ray. Install all missed blocking and nail as noted previously, see plan for locations. install the (2) 9.5xll LVL at barel vault to pickup interior bearing on A4 trusses. Headers required at closet openings on A5 trusses in bedroom.
|
BLD18-02829
| BLD-Footing | 10/8/2018 | 10/9/2018 | 10/9/2018 11:17:10 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Cassandra Hessing Inspection cancelled from web by: Cassandra Hessing
|
BLD18-03011
| BLD-Framing/Rough-in | 10/8/2018 | 10/9/2018 | 10/9/2018 11:07:44 AM | A | PASS |
|
|
Gerald Phone #: ###-####
|
BLD18-00659
| BLD-Framing/Rough-in | 10/8/2018 | 10/9/2018 | 10/9/2018 10:54:40 AM | A | FAIL |
|
|
request first in AM // Mike Phone #: ###-####. Provide staple conversion from engineer as well as fix for holdowns at front of garage.
|
BLD18-02356
| BLD-Framing/Rough-in | 10/8/2018 | 10/9/2018 | 10/9/2018 10:33:35 AM | A | PASS |
|
|
after 10 am please // Said Phone #: ###-####
|
BLD18-02914
| BLD-Wall Bracing | 10/8/2018 | 10/9/2018 | 10/9/2018 10:13:18 AM | P | CANC |
|
|
Plans under home depot bucket in shop being inspected Phone #: ###-#### >> Inspection requested via web by anthony boyd Inspection cancelled from web by: anthony boyd
|
BLD18-02322
| BLD-Framing/Rough-in | 10/8/2018 | 10/9/2018 | 10/8/2018 8:03:27 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Jessica Bradley Inspection cancelled from web by: Jessica Bradley
|
BLD18-02914
| BLD-Wall Bracing | 10/8/2018 | 10/9/2018 | 10/8/2018 5:18:57 PM | A | CANC |
|
|
Plans are under a home depot bucket in the shop you are inspecting Phone #: ###-#### >> Inspection requested via web by anthony boyd Inspection cancelled from web by: anthony boyd
|