Inspections for the day of: Thursday, November 1, 2018.
Number of inspections: 15
Percentage of inspections complete: 93 %
Percentage of inspections not complete: 7 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS18-00414 BLD-Conference10/24/201810/25/2018 A 
per Dan E-working w/o permits
BLD18-00659 BLD-Wall Bracing11/1/201811/1/201811/1/2018 4:30:08 PMPFAIL
Mike Phone #: ###-####. Provide egress window in bonus room and provide min. 36 inch guard next to stairs.
BLD18-02579 BLD-Final11/1/201811/1/201811/1/2018 3:33:45 PMPPART
please call 45 minutes before arrival. Thank you,
Tony Dondero Phone #: ###-#### Inspection requested via web by Tony Dondero. Ok for temp. occ. Needs to provide 1 hr door assembly at future paint booth.
BLD18-02579 BLD-Final10/31/201811/1/201811/1/2018 3:32:57 PMACANC
please call 45 minutes before arrival. Thank you,
Tony Dondero Phone #: ###-#### Inspection requested via web by Tony Dondero
BLD18-03905 BLD-Final11/1/201811/1/201811/1/2018 3:11:32 PMPPART
Jonny Phone #: ###-####. All issues resolved. Ok for temp occ. Will occupy space for less than 180 days. ( I signed wrong side of card, sorry)
BLD18-00796 BLD-Final11/1/201811/1/201811/1/2018 2:44:52 PMPFAIL
On-site contact is Pat Churchman Phone #: ###-#### Inspection requested via web by KJ Savaria. Need special inspection final letter and provide special inspection on the high strength bolting if not completed.
BLD18-02660 BLD-Final11/1/201811/1/201811/1/2018 2:15:01 PMPPASS
Scott Phone #: ###-####. Ok for perm occ. No card on site to sign.
BLD18-02660 FIRE-Final Inspection11/1/201811/1/201811/1/2018 2:14:38 PMPPASS
Scott Phone #: ###-####. All issues resolved. Ok for perm occ. No card on site to sign.
BLD18-01499 BLD-Framing/Rough-in11/1/201811/1/201811/1/2018 1:43:37 PMPFAIL
Phone #: ###-####. Complete airseal pack. Provide non shrink grout under base plates.
BLD18-02795 BLD-Foundation11/1/201811/1/201811/1/2018 1:22:37 PMPPASS
rebar // Chad Phone #: ###-####. Interior and exterior column pad footings.
BLD18-01425 BLD-Framing/Rough-in10/31/201811/1/201811/1/2018 12:24:29 PMADEFR
steel -James Phone #: ###-####. Will have special inspection.
BLD18-00776 BLD-Footing10/31/201811/1/201811/1/2018 10:31:12 AMADEFR
Charley Phone #: ###-####
BLD18-01390 BLD-Wall Bracing10/31/201811/1/201811/1/2018 10:30:52 AMAPART
Shear // Dave Phone #: ###-####. roof nailing and hardware ok to cover. Needs to install missing hold downs and provide the additional rows of nailing at holdown locations as per endwall details. Enginner of record to provide alternate nailing detail for stud nailing at corners.
BLD18-00404 BLD-Foundation10/31/201811/1/201811/1/2018 9:21:52 AMAFAIL
Steve Phone #: ###-####. Needs to upload a plan modification showing new building size and locations. Also noted that a different contractor has placed mono pole footing, no permit or inspections can be found at this time.
BLD18-02356 BLD-Final10/31/201811/1/201811/1/2018 8:51:30 AMAFAIL
request after 10 am // Said Phone #: ###-####. Provide ADA compliant door hardware to restroom. Provided smoke and flame spread data for interior finish on walls in facial room. Correction notice posted.