Inspections for the day of: Tuesday, November 12, 2019.
Number of inspections: 26
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-04114 BLD-Final11/12/201911/12/201911/12/2019 5:19:42 PMPDONE
Phone #: ###-#### Inspection requested via web by Seth Stears
BLD19-04114 DOC - Permit Finaled11/12/201911/12/201911/12/2019 5:19:34 PMPPASS
BLD19-04103 BLD-Framing/Rough-in11/12/201911/12/201911/12/2019 3:21:03 PMPPART
Please call Brian Prussia with any questions Phone #: ###-#### Inspection requested via web by BRS Permitting. 2x6 sistering of existing hand stack roof. Work almost completed. Noted that contractor did not have the approved plans on site. work was inspected and will review approved plans on final.
BLD19-01045 BLD-Final11/12/201911/12/201911/12/2019 2:30:51 PMPPASS
Tony- GC will be call Fire and BLD inspector Phone #: ###-####
BLD19-01045 DOC - Permit Finaled11/12/201911/12/201911/12/2019 2:30:42 PMPPASS
A seperate permit will be required for occupancy.
ESC19-00772 Site Final11/12/201911/12/201911/12/2019 2:06:03 PMPDONE
ESC19-00772 DOC - Permit Finaled11/12/201911/12/201911/12/2019 2:05:54 PMPPASS
BLD19-02088 BLD-Final11/12/201911/12/201911/12/2019 2:05:30 PMPPASS
Call for Access- Gari Phone #: ###-####
BLD19-02088 DOC - Permit Finaled11/12/201911/12/201911/12/2019 2:05:18 PMPPASS
BLD19-03227 BLD-Energy code compliance11/12/201911/12/201911/12/2019 2:03:36 PMPPASS
Gari Phone #: ###-####
BLD19-03227 BLD-Framing/Rough-in11/12/201911/12/201911/12/2019 2:03:22 PMPPASS
Gari Phone #: ###-####
BLD19-02555 BLD-Framing/Rough-in11/11/201911/12/201911/12/2019 1:03:14 PMPFAIL
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Airseal not completed.
BLD19-01485 BLD-Final11/12/201911/12/201911/12/2019 1:02:53 PMPNR
garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs mech final first.
BLD18-02176 BLD-Ceiling Grid Inspection11/12/201911/12/201911/12/2019 1:01:50 PMPPASS
Nacho Phone #: ###-####
MIS19-00337 BLD-Conference10/29/201911/12/201911/12/2019 12:23:22 PMADONE
Check on status and progress... Work in progress.
BLD19-02307 BLD-Framing/Rough-in11/11/201911/12/201911/12/2019 12:20:21 PMAFAIL
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Complete lateral bracing on A06 truss. The A07 truss next to A06 trus appeares to have been modified in the field, justify. Nail of B3G 2ply per the engineering. Roll block trusses at shear wall locations. ok to insulate. Correction notice posted.
BLD19-02012 BLD-Wall Bracing11/11/201911/12/201911/12/2019 11:52:25 AMAPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD19-01486 BLD-Energy code compliance11/11/201911/12/201911/12/2019 11:38:47 AMANR
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD19-01486 BLD-Framing/Rough-in11/11/201911/12/201911/12/2019 11:38:31 AMAFAIL
Phone #: ###-#### Inspection requested via web by Joel Hirtle. A4G 3ply truss not nailed per the truss engineering.
BLD19-01141 BLD-Framing/Rough-in11/8/201911/12/201911/12/2019 11:10:12 AMAPASS
Alex Phone #: ###-####. Roof framing for pump house ok.
BLD19-03317 BLD-Framing/Rough-in11/11/201911/12/201911/12/2019 10:53:48 AMAPASS
Love sac Phone #: ###-#### Inspection requested via web by Blake Neeser. Interior steel stud framed walls ok. Hardlids ok pending mech. and electrical rough in inspections.
BLD18-04521 BLD-Framing/Rough-in11/8/201911/12/201911/12/2019 10:18:51 AMACANC
Exterior Nail inspection Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD18-04521 BLD-Wall Bracing11/12/201911/12/201911/12/2019 10:18:36 AMAPASS
Exterior Nail inspection Phone #: ###-#### Inspection requested via web by Kris Linnell. Exterior and interior shear walls, floors 1 to 3 ok to cover.
BLD19-04165 BLD-Concrete11/8/201911/12/201911/12/2019 9:09:40 AMAPART
basement // Tony Phone #: ###-####
BLD19-01045 BLD-Final11/12/201911/12/201911/12/2019 9:00:27 AMANR
Tony Glenn ###-####. Needs electrical and mech finals as well as fire/life/safety.
BLD19-02530 BLD-Framing/Rough-in11/11/201911/12/201911/12/2019 8:55:46 AMAPART
Inspection requested via web by Scott Henderson. Will have special inspection on high strength bolting. All plys in contact.