BLD19-04114
| BLD-Final | 11/12/2019 | 11/12/2019 | 11/12/2019 5:19:42 PM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Seth Stears
|
BLD19-04114
| DOC - Permit Finaled | 11/12/2019 | 11/12/2019 | 11/12/2019 5:19:34 PM | P | PASS |
|
|
|
BLD19-04103
| BLD-Framing/Rough-in | 11/12/2019 | 11/12/2019 | 11/12/2019 3:21:03 PM | P | PART |
|
|
Please call Brian Prussia with any questions Phone #: ###-#### Inspection requested via web by BRS Permitting. 2x6 sistering of existing hand stack roof. Work almost completed. Noted that contractor did not have the approved plans on site. work was inspected and will review approved plans on final.
|
BLD19-01045
| BLD-Final | 11/12/2019 | 11/12/2019 | 11/12/2019 2:30:51 PM | P | PASS |
|
|
Tony- GC will be call Fire and BLD inspector Phone #: ###-####
|
BLD19-01045
| DOC - Permit Finaled | 11/12/2019 | 11/12/2019 | 11/12/2019 2:30:42 PM | P | PASS |
|
|
A seperate permit will be required for occupancy.
|
ESC19-00772
| Site Final | 11/12/2019 | 11/12/2019 | 11/12/2019 2:06:03 PM | P | DONE |
|
|
|
ESC19-00772
| DOC - Permit Finaled | 11/12/2019 | 11/12/2019 | 11/12/2019 2:05:54 PM | P | PASS |
|
|
|
BLD19-02088
| BLD-Final | 11/12/2019 | 11/12/2019 | 11/12/2019 2:05:30 PM | P | PASS |
|
|
Call for Access- Gari Phone #: ###-####
|
BLD19-02088
| DOC - Permit Finaled | 11/12/2019 | 11/12/2019 | 11/12/2019 2:05:18 PM | P | PASS |
|
|
|
BLD19-03227
| BLD-Energy code compliance | 11/12/2019 | 11/12/2019 | 11/12/2019 2:03:36 PM | P | PASS |
|
|
Gari Phone #: ###-####
|
BLD19-03227
| BLD-Framing/Rough-in | 11/12/2019 | 11/12/2019 | 11/12/2019 2:03:22 PM | P | PASS |
|
|
Gari Phone #: ###-####
|
BLD19-02555
| BLD-Framing/Rough-in | 11/11/2019 | 11/12/2019 | 11/12/2019 1:03:14 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Airseal not completed.
|
BLD19-01485
| BLD-Final | 11/12/2019 | 11/12/2019 | 11/12/2019 1:02:53 PM | P | NR |
|
|
garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs mech final first.
|
BLD18-02176
| BLD-Ceiling Grid Inspection | 11/12/2019 | 11/12/2019 | 11/12/2019 1:01:50 PM | P | PASS |
|
|
Nacho Phone #: ###-####
|
MIS19-00337
| BLD-Conference | 10/29/2019 | 11/12/2019 | 11/12/2019 12:23:22 PM | A | DONE |
|
|
Check on status and progress... Work in progress.
|
BLD19-02307
| BLD-Framing/Rough-in | 11/11/2019 | 11/12/2019 | 11/12/2019 12:20:21 PM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Complete lateral bracing on A06 truss. The A07 truss next to A06 trus appeares to have been modified in the field, justify. Nail of B3G 2ply per the engineering. Roll block trusses at shear wall locations. ok to insulate. Correction notice posted.
|
BLD19-02012
| BLD-Wall Bracing | 11/11/2019 | 11/12/2019 | 11/12/2019 11:52:25 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD19-01486
| BLD-Energy code compliance | 11/11/2019 | 11/12/2019 | 11/12/2019 11:38:47 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD19-01486
| BLD-Framing/Rough-in | 11/11/2019 | 11/12/2019 | 11/12/2019 11:38:31 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. A4G 3ply truss not nailed per the truss engineering.
|
BLD19-01141
| BLD-Framing/Rough-in | 11/8/2019 | 11/12/2019 | 11/12/2019 11:10:12 AM | A | PASS |
|
|
Alex Phone #: ###-####. Roof framing for pump house ok.
|
BLD19-03317
| BLD-Framing/Rough-in | 11/11/2019 | 11/12/2019 | 11/12/2019 10:53:48 AM | A | PASS |
|
|
Love sac Phone #: ###-#### Inspection requested via web by Blake Neeser. Interior steel stud framed walls ok. Hardlids ok pending mech. and electrical rough in inspections.
|
BLD18-04521
| BLD-Framing/Rough-in | 11/8/2019 | 11/12/2019 | 11/12/2019 10:18:51 AM | A | CANC |
|
|
Exterior Nail inspection Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD18-04521
| BLD-Wall Bracing | 11/12/2019 | 11/12/2019 | 11/12/2019 10:18:36 AM | A | PASS |
|
|
Exterior Nail inspection Phone #: ###-#### Inspection requested via web by Kris Linnell. Exterior and interior shear walls, floors 1 to 3 ok to cover.
|
BLD19-04165
| BLD-Concrete | 11/8/2019 | 11/12/2019 | 11/12/2019 9:09:40 AM | A | PART |
|
|
basement // Tony Phone #: ###-####
|
BLD19-01045
| BLD-Final | 11/12/2019 | 11/12/2019 | 11/12/2019 9:00:27 AM | A | NR |
|
|
Tony Glenn ###-####. Needs electrical and mech finals as well as fire/life/safety.
|
BLD19-02530
| BLD-Framing/Rough-in | 11/11/2019 | 11/12/2019 | 11/12/2019 8:55:46 AM | A | PART |
|
|
Inspection requested via web by Scott Henderson. Will have special inspection on high strength bolting. All plys in contact.
|