BLD05-02792
| BLD-Final | 11/13/2017 | 11/15/2017 | 11/15/2017 3:39:43 PM | P | FAIL |
|
|
Art-please call 30 minutes prior to meet for access Phone #: ###-####-customer would like to have it as soon as possible in the PM. Electrical final inspection has failed. Also no framing inspections were conducted. Will have to remove all sheetrock and insulation for framing inspections.
|
BLD17-01088
| BLD-Ceiling Grid Inspection | 11/14/2017 | 11/15/2017 | 11/15/2017 3:30:39 PM | P | PASS |
|
|
Charles Phone #: ###-####. All grid south of corridor 198 in the B occupancy portion of building.
|
BLD17-01088
| BLD-Framing/Rough-in | 11/14/2017 | 11/15/2017 | 11/15/2017 3:28:20 PM | P | PASS |
|
|
Charles Phone #: ###-####. Interior steel stud framed walls at rooms 151/150/152/148 and corridors 149 and 156.
|
BLD17-01767
| BLD-Foundation | 11/14/2017 | 11/15/2017 | 11/15/2017 10:34:30 AM | A | PASS |
|
|
Pouring 3 Piers at 1:15 PM I pier in front of the gold store 1 pier front of old hall mark 1 pier in front of old blockbuster Phone #: ###-#### Inspection requested via web by Josh Strasser
|
BLD17-03240
| BLD-Final | 11/13/2017 | 11/15/2017 | 11/15/2017 9:18:39 AM | A | PASS |
|
|
Steve Phone #: ###-####
|
BLD17-03240
| DOC - Permit Finaled | 11/15/2017 | 11/15/2017 | 11/15/2017 9:18:30 AM | P | PASS |
|
|
|
BLD17-02646
| BLD-Framing/Rough-in | 11/14/2017 | 11/15/2017 | 11/15/2017 9:00:42 AM | A | PASS |
|
|
William Phone #: ###-####. Informed contractor that a plumbing permit is required.
|
BLD17-02688
| BLD-Footing | 11/13/2017 | 11/15/2017 | 11/15/2017 8:31:38 AM | A | PASS |
|
|
Please call homeowner when on the way at ###-#### (Mike Griffith) Phone #: ###-#### Inspection requested via web by Candyce Moss
|