Inspections for the day of: Monday, November 19, 2018.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-03083 BLD-Framing/Rough-in11/19/201811/19/201811/19/2018 3:56:49 PMPNR
Phone #: ###-#### Inspection requested via web by Will Thomason. Needs to provide the city approved plans.
BLD18-01160 BLD-Framing/Rough-in11/19/201811/19/201811/19/2018 3:12:15 PMPPASS
Joseph-grid wire Phone #: ###-####. ceiling grid ok.
BLD18-02372 BLD-Framing/Rough-in11/19/201811/19/201811/19/2018 2:52:30 PMPPASS
Gary Phone #: ###-####. Interior steel stud framed walls be stage and front of house ok.
BLD18-01390 BLD-Wall Bracing11/19/201811/19/201811/19/2018 1:58:05 PMPPASS
Late pm if possible. Thank you. Interior shear. Phone #: ###-#### Inspection requested via web by Sean Worthington
BLD18-00883 BLD-Energy code compliance11/19/201811/19/201811/19/2018 1:40:28 PMPPASS
Tom Phone #: ###-####
BLD18-04068 BLD-Foundation11/16/201811/19/201811/19/2018 1:20:24 PMPPASS
wall // Barb Phone #: ###-####
BLD18-03673 BLD-Framing/Rough-in11/16/201811/19/201811/19/2018 1:09:55 PMAPASS
access is in back (eary as possible)- Kevin Phone #: ###-####
BLD18-03673 BLD-Framing/Rough-in11/19/201811/19/201811/19/2018 1:09:42 PMPPASS
All framing issues have been resolved. Per contractor electrical and mech. rough in work will take place at later date, no sheet rock at htis time. only underground for mech and electrical work.
BLD18-04001 BLD-Framing/Rough-in11/16/201811/19/201811/19/2018 10:12:57 AMAPASS
call 15mins before // Gal Phone #: ###-####
BLD18-04036 BLD-Final11/16/201811/19/201811/19/2018 9:30:06 AMADONE
Inspection requested via web by Hans Weikl
BLD18-04036 DOC - Permit Finaled11/19/201811/19/201811/19/2018 9:29:58 AMPPASS
All work appeared to be donein accordance with local codes and ordiances.
BLD18-02928 BLD-Energy code compliance11/14/201811/19/201811/19/2018 8:58:55 AMAPASS
Todd Phone #: ###-####
BLD18-02925 BLD-Wall Bracing11/16/201811/19/201811/19/2018 8:58:37 AMAPASS
interior shear // Todd Phone #: ###-####
BLD18-03673 BLD-Wall Bracing11/16/201811/19/201811/19/2018 8:29:25 AMAPASS
access is in back (eary as possible)- Kevin Phone #: ###-####