BLD16-04506
| BLD-Foundation | 11/21/2017 | 11/21/2017 | 11/21/2017 2:56:16 PM | P | PASS |
|
|
rebar // sam Phone #: ###-####. Interior thickend footings.
|
BLD16-04507
| BLD-Foundation | 11/21/2017 | 11/21/2017 | 11/21/2017 2:56:02 PM | P | PASS |
|
|
rebar // sam Phone #: ###-####. Interior thickend footings.
|
BLD16-04499
| BLD-Foundation | 11/21/2017 | 11/21/2017 | 11/21/2017 2:55:46 PM | P | PASS |
|
|
rebar // sam Phone #: ###-####. Interior thickend footings.
|
BLD16-04498
| BLD-Foundation | 11/21/2017 | 11/21/2017 | 11/21/2017 2:55:31 PM | P | PASS |
|
|
rebar // sam Phone #: ###-####. Interior thickend footings.
|
BLD16-04492
| BLD-Foundation | 11/21/2017 | 11/21/2017 | 11/21/2017 2:55:16 PM | P | PASS |
|
|
rebar // sam Phone #: ###-####. Interior thickend footings.
|
BLD16-04494
| BLD-Foundation | 11/21/2017 | 11/21/2017 | 11/21/2017 2:55:00 PM | P | PASS |
|
|
rebar // sam Phone #: ###-####. Interior thickend footings.
|
BLD16-04485
| BLD-Foundation | 11/21/2017 | 11/21/2017 | 11/21/2017 2:54:43 PM | P | PASS |
|
|
rebar // sam Phone #: ###-####. Interior thickend footings.
|
BLD16-04484
| BLD-Foundation | 11/21/2017 | 11/21/2017 | 11/21/2017 2:41:19 PM | P | PASS |
|
|
rebar // sam Phone #: ###-####. Interior thickend footings.
|
BLD17-00729
| BLD-Ceiling Grid Inspection | 11/20/2017 | 11/21/2017 | 11/21/2017 1:41:25 PM | P | PASS |
|
|
###-####- Mike.
|
ESC16-01621
| Site Final | 11/21/2017 | 11/21/2017 | 11/21/2017 1:15:58 PM | P | DONE |
|
|
|
ESC16-01621
| DOC - Permit Finaled | 11/21/2017 | 11/21/2017 | 11/21/2017 1:15:50 PM | P | PASS |
|
|
|
BLD16-04349
| BLD-Final | 11/21/2017 | 11/21/2017 | 11/21/2017 1:15:32 PM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Josh Woodbeck
|
BLD16-04349
| DOC - Permit Finaled | 11/21/2017 | 11/21/2017 | 11/21/2017 1:14:57 PM | P | PASS |
|
|
|
BLD17-03734
| BLD-Footing | 11/21/2017 | 11/21/2017 | 11/21/2017 10:57:11 AM | A | PART |
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell. Nees to install reinforcement in column pad footings and provide 10 inch depth at column pad footings.
|
BLD17-03658
| BLD-Foundation | 11/20/2017 | 11/21/2017 | 11/21/2017 10:40:54 AM | A | PART |
|
|
11- Jose Phone #: ###-####
|
BLD17-03841
| BLD-Final | 11/17/2017 | 11/21/2017 | 11/21/2017 9:54:53 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Scott Smith
|
BLD17-03841
| DOC - Permit Finaled | 11/21/2017 | 11/21/2017 | 11/21/2017 9:54:42 AM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
BLD17-02644
| BLD-Final | 11/20/2017 | 11/21/2017 | 11/21/2017 9:39:55 AM | A | PASS |
|
|
greg Phone #: ###-####. Temp occ. granted. Will be ok for perm occ. once plumbing signs perm.
|
BLD17-01332
| BLD-Framing/Rough-in | 11/20/2017 | 11/21/2017 | 11/21/2017 9:14:39 AM | A | PART |
|
|
floor- call on your way please- Vlad Phone #: ###-####. Floor framing over existing garage slab. vapor barrier installed. Needs to insulate with R-30. Advised to dry under floor area prior to insulation and to keep dry.
|
BLD17-03185
| BLD-Wall Bracing | 11/20/2017 | 11/21/2017 | 11/21/2017 8:56:43 AM | A | PASS |
|
|
Dave Phone #: ###-####
|
BLD17-02869
| BLD-Energy code compliance | 11/20/2017 | 11/21/2017 | 11/21/2017 8:38:28 AM | A | PASS |
|
|
Joe Phone #: ###-####
|
BLD17-02869
| BLD-Framing/Rough-in | 11/20/2017 | 11/21/2017 | 11/21/2017 8:38:10 AM | A | PASS |
|
|
Joe Phone #: ###-####. All framing issues have been resolved.
|
BLD17-02867
| BLD-Energy code compliance | 11/20/2017 | 11/21/2017 | 11/21/2017 8:37:49 AM | A | PASS |
|
|
Joe Phone #: ###-####
|
BLD17-02867
| BLD-Framing/Rough-in | 11/20/2017 | 11/21/2017 | 11/21/2017 8:37:39 AM | A | PASS |
|
|
Joe Phone #: ###-####. All framing issues have been resolved.
|