BLD16-03397
| BLD-Footing | 12/19/2016 | 12/20/2016 | 12/20/2016 4:45:16 PM | P | CANC |
|
|
dane Phone #: ###-####
|
BLD16-03129
| BLD-Footing | 12/19/2016 | 12/20/2016 | 12/20/2016 4:44:57 PM | P | CANC |
|
|
dane Phone #: ###-####
|
ESC16-01625
| Site Preparation | 12/20/2016 | 12/20/2016 | 12/20/2016 3:04:41 PM | P | PASS |
|
|
|
BLD16-04362
| BLD-Footing | 12/20/2016 | 12/20/2016 | 12/20/2016 3:04:29 PM | P | PASS |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
ESC16-01620
| Site Preparation | 12/20/2016 | 12/20/2016 | 12/20/2016 3:04:14 PM | P | PASS |
|
|
|
BLD16-04334
| BLD-Footing | 12/20/2016 | 12/20/2016 | 12/20/2016 3:04:02 PM | P | PASS |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
ESC16-01619
| Site Preparation | 12/20/2016 | 12/20/2016 | 12/20/2016 3:03:48 PM | P | PASS |
|
|
|
BLD16-04333
| BLD-Footing | 12/20/2016 | 12/20/2016 | 12/20/2016 3:03:35 PM | P | PASS |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD16-02992
| BLD-Framing/Rough-in | 12/20/2016 | 12/20/2016 | 12/20/2016 2:27:25 PM | P | PART |
|
|
Call for access Phone #: 2084841715 >> Inspection requested via mobile web by Dustin Campbell. Interior steel stud framed wall on gridline J.5. Pending electrical rough in inspection.
|
BLD16-04264
| BLD-Framing/Rough-in | 12/19/2016 | 12/20/2016 | 12/20/2016 1:56:44 PM | A | PASS |
|
|
Please call ahead 20min for access - Tim Phone #: ###-####. Interior steel stud framed walls, phase 1.
|
BLD16-03442
| BLD-Conference | 12/19/2016 | 12/20/2016 | 12/20/2016 12:42:05 PM | A | FAIL |
|
|
Call 30 mins before // ###-####. on site with Bob Archibald and Daryl DeGrange to go over work that was completed with no permits. A coorection notice was issued: Home owner to remove portions of sheet rock as discussed so that framing and wiring can be inspected. Smoke alarms to be hard wired and interconnected and the correct valuation given to city of boise. See electrical case for corrections. Once sheet rock is removed, another building conferance is to be scheduled.
|
BLD16-01693
| BLD-Final | 12/19/2016 | 12/20/2016 | 12/20/2016 11:31:28 AM | A | PASS |
|
|
anne Phone #: ###-####
|
BLD16-01693
| DOC - Permit Finaled | 12/20/2016 | 12/20/2016 | 12/20/2016 11:31:07 AM | P | PASS |
|
|
|
BLD16-04254
| BLD-Framing/Rough-in | 12/19/2016 | 12/20/2016 | 12/20/2016 9:06:29 AM | A | FAIL |
|
|
lock box is on the south side of the building. Code is 1027 Phone #: ###-#### Inspection requested via web by Drew Moorhouse. Remove all screws from top track of wall to grid. Provide lateral support for wall as shown on the approved plans. Correction notice posted.
|
BLD16-04041
| BLD-Conference | 12/17/2016 | 12/20/2016 | 12/20/2016 8:42:31 AM | A | CANC |
|
|
Phone #: 2085015747 >> Inspection requested via mobile web by Thomas Lane
|
BLD16-04041
| BLD-Framing/Rough-in | 12/20/2016 | 12/20/2016 | 12/20/2016 8:42:15 AM | A | PASS |
|
|
Phone #: 2085015747 >> Inspection requested via mobile web by Thomas Lane
|
BLD16-04040
| BLD-Framing/Rough-in | 12/17/2016 | 12/20/2016 | 12/20/2016 8:41:30 AM | A | PASS |
|
|
Phone #: 2085015747 >> Inspection requested via mobile web by Thomas Lane
|
BLD16-02651
| BLD-Final | 12/19/2016 | 12/20/2016 | 12/20/2016 12:00:00 AM | P | CANC |
|
|
Dan Phone #: ###-####
|