BLD18-00053
| BLD-Aging Inspection | 12/20/2018 | 12/20/2018 | 12/21/2018 4:28:33 PM | | PASS |
|
|
Per Cecil with Kreizenbeck construction Demo has begun for phase 2 of the project.
|
BLD18-04476
| FIRE-Final Inspection | 12/20/2018 | 12/20/2018 | 12/20/2018 3:54:43 PM | P | FAIL |
|
|
Call half hour before Brad Phone #: ###-####. Needs to provide the sprinkler analysis report as noted on the fire plan review code notes. Everything else ok.
|
BLD18-01913
| FIRE-Final Inspection | 12/17/2018 | 12/20/2018 | 12/20/2018 3:31:24 PM | P | FAIL |
|
|
Heidi Phone #: ###-####. Provide smoke detector in bedroom, must communicate with hallway smoke detector.
|
BLD17-03518
| FIRE-Final Inspection | 12/19/2018 | 12/20/2018 | 12/20/2018 2:36:44 PM | A | PASS |
|
|
call 30 mintues before // Mike Phone #: ###-####
|
BLD18-03349
| BLD-Foundation | 12/20/2018 | 12/20/2018 | 12/20/2018 1:29:29 PM | P | PASS |
|
|
Hal Phone #: ###-####
|
BLD18-03349
| BLD-Footing | 12/20/2018 | 12/20/2018 | 12/20/2018 1:29:20 PM | P | PART |
|
|
Hal Phone #: ###-####
|
BLD18-02795
| BLD-Footing | 12/20/2018 | 12/20/2018 | 12/20/2018 1:12:33 PM | P | PART |
|
|
Chad-footings & panel Phone #: ###-#### Work in progress. Special inspector on site. Ok to place concrete pending special inspection.
|
BLD18-01912
| BLD-Framing/Rough-in | 12/19/2018 | 12/20/2018 | 12/20/2018 12:41:40 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs to complete airseal prior to framing inspection.
|
BLD18-04056
| FIRE-Final Inspection | 12/19/2018 | 12/20/2018 | 12/20/2018 11:04:36 AM | A | PASS |
|
|
Tom Phone #: ###-####. Life/safety ok.
|
BLD18-04067
| FIRE-Final Inspection | 12/19/2018 | 12/20/2018 | 12/20/2018 10:30:07 AM | A | PASS |
|
|
Eli Phone #: ###-####. All life/safety isues have been resolved.
|
BLD18-02922
| FIRE-Final Inspection | 12/19/2018 | 12/20/2018 | 12/20/2018 9:42:25 AM | A | FAIL |
|
|
Scott Phone #: ###-####. Provide address, provide the missing exit sign at west door and provide ADA hardware at restroom.
|
BLD18-01428
| FIRE-Final Inspection | 12/19/2018 | 12/20/2018 | 12/20/2018 9:16:11 AM | A | PASS |
|
|
justin Phone #: ###-####
|
BLD18-01428
| BLD-Concrete | 12/18/2018 | 12/20/2018 | 12/20/2018 9:15:13 AM | A | PASS |
|
|
bolts-Justin Phone #: ###-####. Wedge anchors for ATM. Holes cleaned and anchors torqued to 60 ft. albs.
|
BLD18-04421
| BLD-Foundation | 12/19/2018 | 12/20/2018 | 12/20/2018 8:59:31 AM | A | PART |
|
|
steam wall... late morning // derik Phone #: ###-####
|
BLD18-02673
| BLD-Final | 12/19/2018 | 12/20/2018 | 12/20/2018 8:48:57 AM | A | PASS |
|
|
Adam Phone #: ###-####. ADa mirrors have been provided. Ok for perm occ.
|