BLD18-02673
| BLD-Final | 12/3/2018 | 12/4/2018 | 12/4/2018 5:01:21 PM | P | PART |
|
|
Adam Phone #: ###-####. Ok for temp occ. Needs to provide mirors in ADA restrooms with reflective surface at 40 inches.
|
BLD17-00270
| BLD-Framing/Rough-in | 12/4/2018 | 12/4/2018 | 12/4/2018 3:16:01 PM | P | PASS |
|
|
Josh-BLDG 5-would like late PM-please call when on way Phone #: ###-####. final layer of 5/8 type x rock ok on 3hr. firewall. Needs to firecaulk top and bottom of wall for final.
|
BLD17-03846
| BLD-Wall Bracing | 12/3/2018 | 12/4/2018 | 12/4/2018 2:54:17 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD18-01160
| BLD-Final | 12/3/2018 | 12/4/2018 | 12/4/2018 1:58:12 PM | P | PASS |
|
|
joseph Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. once public works signs perm.
|
BLD18-03047
| BLD-Final | 12/3/2018 | 12/4/2018 | 12/4/2018 11:49:19 AM | A | FAIL |
|
|
Sue Phone #: ###-####. No footing inspection, Needs to review engineering and truss engineering and install all missing hardware and OSB.
|
BLD18-04334
| BLD-Final | 11/30/2018 | 12/4/2018 | 12/4/2018 10:29:28 AM | A | CANC |
|
|
Call 20 mins ahead- Courtney Phone #: ###-####. No awnser on phone or call back. No access into building. Will need to reschedule.
|
BLD18-03000
| BLD-Final | 12/3/2018 | 12/4/2018 | 12/4/2018 10:25:04 AM | A | PASS |
|
|
Fire re-inspect to be completed early AM Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
|
BLD18-03299
| BLD-Final | 12/3/2018 | 12/4/2018 | 12/4/2018 9:14:53 AM | A | NR |
|
|
Lois Phone #: ###-####. Needs final for mech on range hood first prior to bldg. final. called Lois at provided number and left message.
|
BLD18-00776
| BLD-Concrete | 12/3/2018 | 12/4/2018 | 12/4/2018 9:11:35 AM | A | PART |
|
|
slab on grad // Charlie Phone #: ###-####. Needs to clean bottom of interior thickend footings and provide dobees.
|