BLD17-02427
| BLD-Energy code compliance | 12/7/2017 | 12/7/2017 | 12/7/2017 4:06:44 PM | P | PASS |
|
|
Foundation insulation Phone #: ###-#### Inspection requested via web by Marty Short
|
BLD17-02416
| BLD-Footing | 12/7/2017 | 12/7/2017 | 12/7/2017 4:06:31 PM | P | PASS |
|
|
Interior footings Phone #: ###-#### Inspection requested via web by Marty Short
|
BLD17-02415
| BLD-Footing | 12/7/2017 | 12/7/2017 | 12/7/2017 4:06:18 PM | P | PASS |
|
|
Interior footings Phone #: ###-#### Inspection requested via web by Marty Short
|
BLD17-02411
| BLD-Energy code compliance | 12/7/2017 | 12/7/2017 | 12/7/2017 4:06:05 PM | P | CANC |
|
|
Foundation insulation Phone #: ###-#### Inspection requested via web by Marty Short
|
BLD17-02849
| BLD-Framing/Rough-in | 12/7/2017 | 12/7/2017 | 12/7/2017 3:43:32 PM | P | PASS |
|
|
Jessica Phone #: ###-####
|
BLD17-01088
| BLD-Ceiling Grid Inspection | 12/7/2017 | 12/7/2017 | 12/7/2017 3:02:00 PM | P | PART |
|
|
Charles-above ceiling Phone #: ###-####. Corridor only between existing hospital and new cafeteria. Needs to complete fire stopping at #hr. wall and 1hr. wall above grid.
|
BLD16-02753
| BLD-Wall Bracing | 12/7/2017 | 12/7/2017 | 12/7/2017 2:19:05 PM | P | PASS |
|
|
Sam Phone #: ###-####
|
BLD16-02752
| BLD-Wall Bracing | 12/7/2017 | 12/7/2017 | 12/7/2017 2:18:51 PM | P | PASS |
|
|
Sam Phone #: ###-####
|
BLD16-02757
| BLD-Wall Bracing | 12/7/2017 | 12/7/2017 | 12/7/2017 2:18:29 PM | P | PASS |
|
|
Sam Phone #: ###-####
|
BLD17-03610
| BLD-Wall Bracing | 12/7/2017 | 12/7/2017 | 12/7/2017 1:54:11 PM | P | FAIL |
|
|
Zane Phone #: ###-####. Attach bottom of OSB to bottom plate on west wall. Re-fasten edges and around openings on east wall. Correction notice posted.
|
BLD17-02890
| BLD-Final | 12/6/2017 | 12/7/2017 | 12/7/2017 1:28:47 PM | A | DONE |
|
|
Dallin Phone #: ###-####
|
BLD17-02890
| DOC - Permit Finaled | 12/7/2017 | 12/7/2017 | 12/7/2017 1:28:31 PM | P | PASS |
|
|
All work appeared to be don in accordance with ocal codes and ordinances.
|
BLD17-03027
| BLD-Energy code compliance | 12/6/2017 | 12/7/2017 | 12/7/2017 1:27:59 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD17-03027
| BLD-Framing/Rough-in | 12/6/2017 | 12/7/2017 | 12/7/2017 1:27:47 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD16-01757
| BLD-Ceiling Grid Inspection | 12/7/2017 | 12/7/2017 | 12/7/2017 11:04:05 AM | A | PASS |
|
|
Building 200 ceiling grid ok.
|
BLD17-00091
| BLD-Framing/Rough-in | 12/6/2017 | 12/7/2017 | 12/7/2017 10:36:25 AM | A | PART |
|
|
Lee Phone #: ###-####. Framing inspection for rooms 124, 126, 123 128, 224,226, 223, 228 and mech rmson 1st. and 2nd. floors in area #2. Needs to provide rated washer boxes and provide Documentation on dryer boxes, patch and fire caulk all pre rock at furred walls. Still needs to provide UL documentation for plastic pipe through penetrations at 3hr. horizontal assembly. Engineer to review removal of OSB at shear wall. Remove low voltage boxes in fire partitions and provide rated box. Ok to insualte exterior walls and ceilings.
|
BLD17-00595
| BLD-Framing/Rough-in | 12/7/2017 | 12/7/2017 | 12/7/2017 9:42:31 AM | A | PART |
|
|
New header ok. Complete all fire blocking and electrical rough in inspection, recall when completed.
|
BLD16-01757
| BLD-Ceiling Grid Inspection | 12/6/2017 | 12/7/2017 | 12/7/2017 9:41:11 AM | A | PART |
|
|
Nathan Phone #: ###-####. Wrong inspection entered. rescheduled.
|
BLD17-01078
| BLD-Framing/Rough-in | 12/6/2017 | 12/7/2017 | 12/7/2017 9:39:43 AM | A | CANC |
|
|
Brent Phone #: ###-####. Wrong permit called in.
|
BLD16-00751
| BLD-Final | 12/6/2017 | 12/7/2017 | 12/7/2017 8:52:04 AM | A | NR |
|
|
Verizon Wireless Cellphone Site, Gate combo is 2914 Phone #: ###-#### Inspection requested via web by Nathan Bly. Fire /life/safety final has failed. needs fire/life safety fist.
|
BLD17-03441
| BLD-Foundation | 12/6/2017 | 12/7/2017 | 12/7/2017 8:51:07 AM | A | PASS |
|
|
(mud at 9) Zach Phone #: ###-####
|