Inspections for the day of: Friday, February 22, 2019.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-02558 BLD-Conference2/21/20192/22/20192/22/2019 4:06:32 PMPDONE
Issue CN to complete installation of smoke/carbon detector.. Correction notice issued.
BLD18-01425 BLD-Framing/Rough-in2/22/20192/22/20192/22/2019 3:58:49 PMPPASS
Interior steel stud framed walls for areas B and C. All menbrane penetrations have been protected at rated walls. Still needs to insulate exterior walls .
BLD18-03251 BLD-Framing/Rough-in2/22/20192/22/20192/22/2019 3:56:38 PMPNR
Interior wall inspection. Phone #: ###-#### Inspection requested via web by Jimmie Miller. Needs electrical rough in inspection first.
BLD18-03923 BLD-Final2/21/20192/22/20192/22/2019 2:54:34 PMPPART
3rd floor // Steve Phone #: ###-####. Ok to occupy 3rd floor.
BLD18-00883 BLD-Final2/22/20192/22/20192/22/2019 2:07:13 PMPPASS
Tom Phone #: ###-####
BLD18-00883 DOC - Permit Finaled2/22/20192/22/20192/22/2019 2:07:03 PMPPASS
BLD18-04385 BLD-Energy code compliance2/22/20192/22/20192/22/2019 1:47:54 PMPNR
Phone #: ###-#### Inspection requested via web by Joel Hirtle. No insulation has been installed, insulaters not on site.
BLD19-00180 BLD-Framing/Rough-in2/22/20192/22/20192/22/2019 1:36:19 PMPPART
Jon Phone #: ###-####. Interior wood stud framing for new door framing and humidor ok, Pending MEP rough in inspection.
BLD19-00047 BLD-Foundation2/22/20192/22/20192/22/2019 1:17:06 PMPPART
Sergio Phone #: ###-####
BLD18-03200 BLD-Foundation2/21/20192/22/20192/22/2019 11:56:39 AMADEFR
rebar-Gene Phone #: ###-####
BLD18-02024 BLD-Concrete2/21/20192/22/20192/22/2019 10:33:44 AMAPASS
Steve Phone #: ###-####. Equipment pad ok.
BLD18-02612 BLD-Final2/21/20192/22/20192/22/2019 10:33:22 AMADONE
Phone #: ###-#### Inspection requested via web by Brecklee Brown
BLD18-02612 DOC - Permit Finaled2/22/20192/22/20192/22/2019 10:33:14 AMPPASS
BLD18-02176 BLD-Footing2/18/20192/22/20192/22/2019 9:52:33 AMAPASS
early am Phone #: ###-#### Inspection requested via web by Steve Mitchell. Interior column pad footings on grids 2 and 3 between grids n to W. Frost wall on gridline 1 between grids N to CC.
BLD18-00960 BLD-Aging Inspection2/22/20192/22/20192/22/2019 9:27:47 AM CANC
MIS18-00157 MIS-Aging Inspection2/22/20192/22/20192/22/2019 9:27:32 AM PASS
MIS18-00157 DOC - Permit Finaled2/22/20192/22/20192/22/2019 9:27:25 AMPPASS
MIS18-00156 DOC - Permit Finaled2/22/20192/22/20192/22/2019 9:25:32 AMPPASS
A permit was issued and finaled.
BLD19-00180 BLD-Framing/Rough-in2/21/20192/22/20192/22/2019 8:44:51 AMANR
John Phone #: ###-####. No plans on site. Will need to rescedule. Appears framing not all completed, still needs electrical and mech permits.