Inspections for the day of: Wednesday, February 26, 2020.
Number of inspections: 28
Percentage of inspections complete: 96 %
Percentage of inspections not complete: 4 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-04185 BLD-Concrete2/21/20202/21/2020 P 
CMU wall - pouring at 2pm // Chad Phone #: ###-####
BLD18-04519 BLD-Framing/Rough-in2/26/20202/26/20202/26/2020 4:14:13 PMPNR
Shear re-inspection Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD20-00150 BLD-Foundation2/25/20202/26/20202/26/2020 4:14:00 PMPPART
Dane Phone #: ###-####
BLD20-00261 BLD-Foundation2/25/20202/26/20202/26/2020 4:13:45 PMPPART
Dane Phone #: ###-####
BLD20-00153 BLD-Foundation2/25/20202/26/20202/26/2020 3:37:17 PMPPART
Dane Phone #: ###-####
BLD19-04169 BLD-Final2/26/20202/26/20202/26/2020 2:43:19 PMPPASS
door will be open Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD19-04169 DOC - Permit Finaled2/26/20202/26/20202/26/2020 2:43:11 PMPPASS
BLD19-04169 BLD-Blower Door Test Results2/26/20202/26/20202/26/2020 2:42:55 PMPDONE
3.1
BLD19-04172 BLD-Final2/26/20202/26/20202/26/2020 2:32:54 PMPPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD19-04172 DOC - Permit Finaled2/26/20202/26/20202/26/2020 2:32:44 PMPPASS
All issues resolved.
BLD19-04172 BLD-Blower Door Test Results2/26/20202/26/20202/26/2020 2:31:17 PMPDONE
5.8
BLD19-04179 BLD-Final2/26/20202/26/20202/26/2020 2:19:25 PMPPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD19-04179 DOC - Permit Finaled2/26/20202/26/20202/26/2020 2:19:15 PMPPASS
BLD19-04179 BLD-Blower Door Test Results2/26/20202/26/20202/26/2020 2:16:37 PMPDONE
5.5
BLD19-04255 BLD-Final2/26/20202/26/20202/26/2020 2:08:54 PMPFAIL
Phone #: ###-#### Inspection requested via web by Joel Hirtle. complete fire caulking in garage. repair sheet rock on house/garage seperation.
BLD19-04255 BLD-Blower Door Test Results2/26/20202/26/20202/26/2020 2:07:57 PMPDONE
4.9
BLD19-04254 BLD-Final2/26/20202/26/20202/26/2020 2:07:26 PMPPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD19-04254 DOC - Permit Finaled2/26/20202/26/20202/26/2020 2:07:16 PMPPASS
BLD19-04254 BLD-Blower Door Test Results2/26/20202/26/20202/26/2020 2:07:06 PMPDONE
4.4
BLD19-02218 BLD-Final2/25/20202/26/20202/26/2020 11:29:06 AMAPEND
Mike Phone #: ###-####. QWill be ok to final once zoning has finaled.
BLD19-02982 BLD-Final2/25/20202/26/20202/26/2020 10:52:30 AMAPASS
Jose Phone #: ###-####
BLD19-02982 DOC - Permit Finaled2/26/20202/26/20202/26/2020 10:52:17 AMPPASS
BLD19-03898 BLD-Final2/25/20202/26/20202/26/2020 10:32:55 AMAPART
Temp Occupancy Phone #: ###-#### Inspection requested via web by Nate Carriveau. Ok for temp occ. Needs to post max of 40 occupant load sign in room 138 and have fixed seating installed.
BLD20-00049 BLD-Wall Bracing2/26/20202/26/20202/26/2020 9:43:40 AMAPASS
Mike,
Plans are in the kitchen, thanks
Rob 208 559 5829 Inspection requested via web by Rob Ashworth
BLD20-00047 BLD-Framing/Rough-in2/26/20202/26/20202/26/2020 9:43:22 AMAPASS
Mike, engineers fix, is in same bag as plans in the kitchen.
Thanks. Rob. 208 559 5823 Inspection requested via web by Rob Ashworth
BLD20-00045 BLD-Framing/Rough-in2/26/20202/26/20202/26/2020 9:18:38 AMAFAIL
Mike, truss calcs, are the kitchen with plans,
Thanks. Rob. 208 559 5823 Inspection requested via web by Rob Ashworth. Nail off all simpson hangars in garage. Attic access will be required in garage. Fire block concealed area next to masterbedroom shower at ceiling level. Ok to insulate. Correction notice posted.
BLD20-00284 BLD-Final2/25/20202/26/20202/26/2020 8:46:33 AMAPASS
Christina Phone #: ###-####. Ok for perm occ.
BLD20-00103 BLD-Final2/25/20202/26/20202/26/2020 8:14:50 AMAPASS
Jay Phone #: ###-####. Per inspector #425, ok for perm occ.