Inspections for the day of: Friday, February 3, 2017.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-03291 BLD-Final2/2/20172/3/20172/3/2017 5:02:45 PMPFAIL
josh Phone #: ###-####. Nees zoning final.. Also noted that existing gate was to be removed from outdoor seating and handrails installed as this is part of the egress path as noted on the approved plans.
BLD16-04584 BLD-Framing/Rough-in2/2/20172/3/20172/3/2017 3:52:04 PMPPASS
Kenji Phone #: ###-####
BLD17-00127 BLD-Final2/2/20172/3/20172/3/2017 3:28:01 PMPPASS
would like call ahead; Kelsey Phone #: ###-####. Ok for perm occ.
BLD17-00007 BLD-Framing/Rough-in2/2/20172/3/20172/3/2017 3:27:39 PMPPASS
Garrett// please call 20 min ahead Phone #: ###-####
BLD15-04496 BLD-Final2/3/20172/3/20172/3/2017 2:47:27 PMPPEND
Austin-please ask for the rest manager or call Austin-need final for perm c of o Phone #: ###-####. Will rescheduke for monday.
BLD16-04174 BLD-Framing/Rough-in2/3/20172/3/20172/3/2017 1:46:22 PMPPASS
Phone #: ###-####. received new engineering. All work corrected per the new engineering.
BLD16-02179 BLD-Final2/2/20172/3/20172/3/2017 1:28:39 PMPDONE
Replace the existing pylon display with a new monument display Phone #: ###-#### Inspection requested via web by Ken Olsen
BLD16-02179 DOC - Permit Finaled2/3/20172/3/20172/3/2017 1:28:31 PMPPASS
BLD16-03242 BLD-Conference2/3/20172/3/20172/3/2017 1:27:53 PMPDONE
BLD16-03242 BLD-Conference2/2/20172/3/20172/3/2017 11:43:20 AMACANC
conference for Building and Safety Final Phone #: ###-#### Inspection requested via web by Todd Landvatter. Moved to pm.
BLD16-02899 BLD-Final2/2/20172/3/20172/3/2017 10:50:01 AMACANC
Herb Phone #: ###-#### **not sure this should be a final. herb said roof, but didn't sound too sure**
BLD16-02899 BLD-Framing/Rough-in2/3/20172/3/20172/3/2017 10:49:15 AMAPASS
Herb Phone #: ###-#### **not sure this should be a final. herb said roof, but didn't sound too sure**. Roof nailing ok.
BLD16-02646 BLD-Wall Bracing2/2/20172/3/20172/3/2017 9:58:12 AMAPASS
Sheet rock // Pat Phone #: ###-####
BLD16-02966 BLD-Framing/Rough-in2/1/20172/3/20172/3/2017 9:31:13 AMAFAIL
Phone #: ###-#### Inspection requested via web by Clint Wall. Complete lateral bracing on C03 truss. Roll block floor joist at interior bearing wall (1st.floor) between front door and barrell vault.. Ok to insulate. Correction notice issued.
BLD16-03107 BLD-Framing/Rough-in2/2/20172/3/20172/3/2017 9:01:30 AMAFAIL
Phone #: ###-#### Inspection requested via web by Kyle Seick. Complete install of holdown in closet next to front door. Fireblock furdown between mech. shafts upstairs. provide truss engineering. ok to insulate.
BLD16-02992 BLD-Final2/3/20172/3/20172/3/2017 12:00:00 AMPCANC
Dustin Phone #: ###-####