BLD18-04531
| BLD-Final | 3/1/2019 | 3/1/2019 | 3/1/2019 3:18:05 PM | P | CANC |
|
|
Tom Phone #: ###-####
|
BLD18-02551
| BLD-Final | 2/28/2019 | 3/1/2019 | 3/1/2019 3:17:56 PM | P | CANC |
|
|
Call 30 mins ahead of time. Phone #: ###-#### Inspection requested via web by Johnathon McGee
|
BLD18-04384
| BLD-Framing/Rough-in | 3/1/2019 | 3/1/2019 | 3/1/2019 3:02:48 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD18-04577
| BLD-Energy code compliance | 3/1/2019 | 3/1/2019 | 3/1/2019 2:39:27 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD18-04577
| BLD-Framing/Rough-in | 3/1/2019 | 3/1/2019 | 3/1/2019 2:39:16 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD19-00327
| BLD-Final | 3/1/2019 | 3/1/2019 | 3/1/2019 1:57:51 PM | P | DONE |
|
|
Walt Phone #: ###-####
|
BLD19-00327
| DOC - Permit Finaled | 3/1/2019 | 3/1/2019 | 3/1/2019 1:57:42 PM | P | PASS |
|
|
|
BLD17-02871
| BLD-Framing/Rough-in | 3/1/2019 | 3/1/2019 | 3/1/2019 1:48:14 PM | P | PASS |
|
|
John Phone #: ###-####. fireblocking in donor hall.
|
BLD17-02871
| BLD-Energy code compliance | 3/1/2019 | 3/1/2019 | 3/1/2019 1:47:53 PM | P | PASS |
|
|
John Phone #: ###-####
|
BLD18-04052
| BLD-Final | 3/1/2019 | 3/1/2019 | 3/1/2019 1:11:46 PM | P | PASS |
|
|
Daniel Phone #: ###-####
|
BLD18-04052
| DOC - Permit Finaled | 3/1/2019 | 3/1/2019 | 3/1/2019 1:11:39 PM | P | PASS |
|
|
|
BLD18-02176
| BLD-Footing | 2/25/2019 | 3/1/2019 | 3/1/2019 10:56:45 AM | A | DEFR |
|
|
early am Phone #: ###-#### Inspection requested via web by Steve Mitchell. West service bays frost wall, special inspector on site.
|
BLD19-00422
| BLD-Framing/Rough-in | 2/28/2019 | 3/1/2019 | 3/1/2019 10:46:11 AM | A | NR |
|
|
Elaina Phone #: ###-####. Will get MEP permits and rough in inspections first.
|
BLD18-01425
| BLD-Framing/Rough-in | 2/28/2019 | 3/1/2019 | 3/1/2019 10:31:12 AM | A | PASS |
|
|
Base layer of 5/8 type x rock on 2hr. fire wall at area C and D seperation.
|
BLD18-00053
| BLD-Ceiling Grid Inspection | 2/28/2019 | 3/1/2019 | 3/1/2019 10:03:25 AM | A | PASS |
|
|
Cecil Phone #: ###-####
|
BLD19-00143
| BLD-Framing/Rough-in | 2/28/2019 | 3/1/2019 | 3/1/2019 9:26:52 AM | A | PASS |
|
|
Mike, If no one is there. The lockbox code to the left of the door is 9701. Thx. Todd. Phone #: ###-#### Inspection requested via web by Todd Kurns. Interior steel stud framed walls ok.
|
BLD17-04612
| BLD-Footing | 2/28/2019 | 3/1/2019 | 3/1/2019 9:11:39 AM | A | PASS |
|
|
Jeff Phone #: ###-####. Footings have been excavated down to 24 inch min depth.
|
BLD19-00470
| BLD-Footing | 2/28/2019 | 3/1/2019 | 3/1/2019 9:03:49 AM | A | PASS |
|
|
Ed Phone #: ###-####. Issues resolved.
|
BLD18-02795
| BLD-Foundation | 2/28/2019 | 3/1/2019 | 3/1/2019 8:55:28 AM | A | PART |
|
|
Chad Phone #: ###-####. MAsonry elevator shaft, top of stemwall to 4ft. elevation. Will do hight lift, cleanouts ok, engineer of record ok. Ok pending special inspection.
|
BLD18-03200
| BLD-Concrete | 2/28/2019 | 3/1/2019 | 3/1/2019 8:29:08 AM | A | PART |
|
|
rebar- Gene Phone #: ###-####. Remaining exterior east footing. Work in progress, ok to place concrete pending special inspection.
|