Inspections for the day of: Wednesday, March 18, 2020.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD20-00905 BLD-Final3/18/20203/18/20203/18/2020 4:19:43 PMPDONE
Inspection requested via web by Richard Murray
BLD20-00905 DOC - Permit Finaled3/18/20203/18/20203/18/2020 4:19:33 PMPPASS
BLD19-04185 BLD-Final3/17/20203/18/20203/18/2020 4:00:06 PMPPASS
Chad Phone #: ###-####
BLD19-04185 DOC - Permit Finaled3/18/20203/18/20203/18/2020 3:59:58 PMPPASS
BLD19-04185 FIRE-Final Inspection3/18/20203/18/20203/18/2020 3:59:52 PMPPASS
Chad Phone #: ###-####
BLD19-04926 BLD-Framing/Rough-in3/18/20203/18/20203/18/2020 3:44:48 PMPPASS
Phone #: ###-#### Inspection requested via web by Korey Hall
BLD18-04520 BLD-Framing/Rough-in3/18/20203/18/20203/18/2020 3:36:15 PMPFAIL
Energy Seal, Fire Caulking ; Framing for Cover of Building 11 - Tower 3 (North 12 units). Phone #: ###-#### Inspection requested via web by Bob Goodwin
BLD19-04907 BLD-Final3/18/20203/18/20203/18/2020 2:42:02 PMPPART
Julian Phone #: ###-####. Ok to occupy cafeteria. Noted non functioning exit signs have been repaired. Fire extinguisher installed.
BLD20-00949 BLD-Conference3/18/20203/18/20203/18/2020 2:08:34 PMPDONE
Please call me to discuss requirements for foundation inspection. This project consists of a monolithic footing/foundation/slab. I don''t think an on-site discussion is required, possibly just a phone call to discuss.

Thank you. Paul Phone #: ###-#### Inspection requested via web by Paul Nesbitt
BLD18-04291 BLD-Final3/18/20203/18/20203/18/2020 2:04:53 PMPPASS
Ian Phone #: ###-####. Ok for perm occ.
BLD20-00052 BLD-Framing/Rough-in3/18/20203/18/20203/18/2020 2:04:35 PMPPASS
Joel Phone #: ###-####
BLD19-04518 BLD-Framing/Rough-in3/18/20203/18/20203/18/2020 1:34:54 PMPPASS
Interior wall and soffit framing in Hall H11 ; Room 105. Phone #: ###-#### Inspection requested via web by Markus Schlegel
BLD18-01027 BLD-Conference3/6/20203/18/20203/18/2020 11:27:10 AMADONE
BLD19-04100 BLD-Footing3/17/20203/18/20203/18/2020 10:19:08 AMAPASS
Call for location of plans // Dave Phone #: ###-####
BLD19-00561 BLD-Energy code compliance3/18/20203/18/20203/18/2020 10:05:08 AMACANC
Phone #: ###-#### Inspection requested via web by Shane Shade
BLD19-00559 BLD-Energy code compliance3/18/20203/18/20203/18/2020 10:04:57 AMACANC
Phone #: ###-#### Inspection requested via web by Shane Shade
BLD19-00558 BLD-Energy code compliance3/18/20203/18/20203/18/2020 10:04:45 AMACANC
Phone #: ###-#### Inspection requested via web by Shane Shade
BLD19-00559 BLD-Framing/Rough-in3/18/20203/18/20203/18/2020 10:04:32 AMAFAIL
Please call 15 minutes prior to inspection Phone #: ###-#### Inspection requested via web by Shane Shade. fire caulk pentrations in firewall, repair holes in draft stop. Address sill heights for egress windows, extend the 1hr. wall upstairs to the exterio wall and rock soffitt. ok to insulate.
BLD19-00561 BLD-Framing/Rough-in3/18/20203/18/20203/18/2020 10:00:29 AMAFAIL
Please call Shane 15 minutes prior to inspection. Phone #: ###-#### Inspection requested via web by Shane Shade. Fire caulk penetrations in firewall, repair draft stops, address sill heights for egress windows.
BLD19-00558 BLD-Framing/Rough-in3/18/20203/18/20203/18/2020 9:59:29 AMAFAIL
Please call 15 minutes prior to inspection Phone #: ###-#### Inspection requested via web by Shane Shade. Fire caulk penetrations in fire wall, patch holes in draft stop in attics, contractor to address sill heights for egress windows. fireblock chase at ceiling upstairs. ok to insulate.
BLD19-04926 BLD-Framing/Rough-in3/17/20203/18/20203/18/2020 8:45:16 AMAPEND
Phone #: ###-#### Inspection requested via web by Korey Hall. Complete all fireblocking and airseal. Need to reschedule when completed.
GRD19-00099 GRD-Conference3/17/20203/18/20203/18/2020 8:20:26 AMADONE
John Phone #: ###-####