BLD20-00705
| BLD-Final | 3/2/2020 | 3/2/2020 | 3/3/2020 7:20:55 AM | P | DONE |
|
|
Walter Phone #: ###-####
|
BLD19-02963
| BLD-Conference | 3/2/2020 | 3/2/2020 | 3/2/2020 4:03:30 PM | P | DONE |
|
|
I have my Electrical and Plumbing rough-ins signed off. I would like to schedule your rough-in inspection. Please give a call approximately 30 min prior for a quick question and to ensure I am not out doing a run to Lowes. Thanks.
Don Phone #: ###-#### Inspection requested via web by Don Taylor
|
BLD20-00290
| BLD-Wall Bracing | 3/2/2020 | 3/2/2020 | 3/2/2020 3:42:48 PM | P | FAIL |
|
|
Lewis Phone #: ###-####. Staples are over spaced. Several areas are not fasyened. provide hot dipped galvanized nails into sill plate. Correction notice posted. Do not cover.
|
BLD20-00511
| BLD-Final | 2/27/2020 | 3/2/2020 | 3/2/2020 3:22:56 PM | P | PASS |
|
|
Ty Phone #: ###-####
|
BLD19-02261
| BLD-Energy code compliance | 3/2/2020 | 3/2/2020 | 3/2/2020 2:56:04 PM | P | PASS |
|
|
Call for access- William Phone #: ###-####
|
BLD19-04327
| BLD-Final | 2/28/2020 | 3/2/2020 | 3/2/2020 2:43:36 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ethan Gylling
|
BLD19-04327
| DOC - Permit Finaled | 3/2/2020 | 3/2/2020 | 3/2/2020 2:43:27 PM | P | PASS |
|
|
|
BLD19-02963
| BLD-Framing/Rough-in | 3/2/2020 | 3/2/2020 | 3/2/2020 2:11:34 PM | P | PASS |
|
|
I have my Electrical and Plumbing rough-ins signed off. I would like to schedule your rough-in inspection. Please give a call approximately 30 min prior for a quick question and to ensure I am not out doing a run to Lowes. Thanks.
Don Phone #: ###-#### Inspection requested via web by Don Taylor
|
BLD20-00591
| BLD-Other | 3/2/2020 | 3/2/2020 | 3/2/2020 1:38:57 PM | P | DONE |
|
|
Inspection on a completion re-roof project. Asphalt shingles with TPO. Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD20-00591
| DOC - Permit Finaled | 3/2/2020 | 3/2/2020 | 3/2/2020 1:38:44 PM | P | PASS |
|
|
All work appeared to be done in acordance with local codes and ordinaces.
|
BLD19-04862
| BLD-Final | 3/2/2020 | 3/2/2020 | 3/2/2020 1:25:50 PM | P | PASS |
|
|
John Phone #: ###-####
|
BLD19-04862
| DOC - Permit Finaled | 3/2/2020 | 3/2/2020 | 3/2/2020 1:25:41 PM | P | PASS |
|
|
|
BLD19-04625
| BLD-Final | 3/2/2020 | 3/2/2020 | 3/2/2020 1:25:12 PM | P | PART |
|
|
John Phone #: ###-####. Ok to occupy gym only. Transitions in flooring installed.
|
BLD19-02464
| BLD-Framing/Rough-in | 2/28/2020 | 3/2/2020 | 3/2/2020 11:33:34 AM | A | PASS |
|
|
roof nailing // Ed Phone #: ###-####. Main roof structure.
|
BLD19-03693
| BLD-Final | 2/28/2020 | 3/2/2020 | 3/2/2020 9:53:14 AM | A | PASS |
|
|
Christina Phone #: ###-####
|
BLD19-03693
| DOC - Permit Finaled | 3/2/2020 | 3/2/2020 | 3/2/2020 9:53:07 AM | P | PASS |
|
|
|
BLD19-03693
| Extend Permit 90/180 days | 3/2/2020 | 3/2/2020 | 3/2/2020 9:52:59 AM | A | DONE |
|
|
2.7
|
BLD19-02007
| BLD-Final | 2/28/2020 | 3/2/2020 | 3/2/2020 9:11:56 AM | A | PASS |
|
|
JIm Phone #: ###-####
|
BLD19-02007
| DOC - Permit Finaled | 3/2/2020 | 3/2/2020 | 3/2/2020 9:11:43 AM | P | PASS |
|
|
|
BLD19-02007
| BLD-Blower Door Test Results | 3/2/2020 | 3/2/2020 | 3/2/2020 9:11:36 AM | A | DONE |
|
|
4.7
|
BLD19-03081
| BLD-Final | 2/28/2020 | 3/2/2020 | 3/2/2020 9:01:51 AM | A | PASS |
|
|
JIm Phone #: ###-####
|
BLD19-03081
| DOC - Permit Finaled | 3/2/2020 | 3/2/2020 | 3/2/2020 9:01:43 AM | P | PASS |
|
|
|
BLD19-03081
| BLD-Blower Door Test Results | 3/2/2020 | 3/2/2020 | 3/2/2020 9:01:33 AM | A | DONE |
|
|
4.5
|
BLD19-03082
| BLD-Final | 2/28/2020 | 3/2/2020 | 3/2/2020 9:00:59 AM | A | PASS |
|
|
JIm Phone #: ###-####
|
BLD19-03082
| DOC - Permit Finaled | 3/2/2020 | 3/2/2020 | 3/2/2020 9:00:59 AM | P | PASS |
|
|
|
BLD19-03082
| BLD-Blower Door Test Results | 3/2/2020 | 3/2/2020 | 3/2/2020 9:00:59 AM | A | DONE |
|
|
4.5
|
BLD19-03470
| BLD-Framing/Rough-in | 2/28/2020 | 3/2/2020 | 3/2/2020 8:48:15 AM | A | PASS |
|
|
call for access-Ed Phone #: ###-####
|