Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-03710 BLD-Final3/18/20203/20/20203/20/2020 4:06:40 PMPNR
Cindy Phone #: ###-####. Needs mech final, plumbing final has failed.
BLD20-00258 BLD-Wall Bracing3/18/20203/20/20203/20/2020 3:48:23 PMPPASS
shear // Ben Phone #: ###-####
BLD20-00822 BLD-Foundation3/20/20203/20/20203/20/2020 3:47:37 PMPPASS
wall // Allen Phone #: ###-####
BLD20-00749 BLD-Foundation3/20/20203/20/20203/20/2020 3:47:37 PMPPART
wall // Allen Phone #: ###-####
BLD18-04369 BLD-Ceiling Grid Inspection3/20/20203/20/20203/20/2020 2:38:30 PMPPART
2nd floor ceiling grid for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner. Grid ok pending electrical and mech. rough in inspection.
BLD18-04243 BLD-Ceiling Grid Inspection3/20/20203/20/20203/20/2020 2:38:10 PMPPART
2nd floor ceiling grid for cover Phone #: ###-#### Inspection requested via web by Jared Waggoner. Grid ok pending electrical and mech. rough in inspection.
BLD20-00084 BLD-Final3/10/20203/20/20203/20/2020 2:18:22 PMPNR
joshua Phone #: ###-####.Needs plumbing final first.
BLD18-03971 BLD-Final3/20/20203/20/20203/20/2020 1:14:22 PMPPASS
energy cert notice posted on breaker box door.

handrails have been raised Phone #: ###-#### Inspection requested via web by Stephen Griswold. All issues were resolved.
BLD18-03971 BLD-Blower Door Test Results3/20/20203/20/20203/20/2020 1:14:15 PMPDONE
4.3
BLD20-00853 BLD-Framing/Rough-in3/19/20203/20/20203/20/2020 11:05:59 AMAPASS
AM inspection requested 3/20, LATE AM if possible please. Footing inspection requested simultaneously. Phone #: ###-#### Inspection requested via web by David Dexter
BLD20-00853 BLD-Footing3/19/20203/20/20203/20/2020 11:05:46 AMAPASS
AM inspection requested 3/20, LATE AM if possible please. Framing inspection requested simultaneously. Phone #: ###-#### Inspection requested via web by David Dexter
BLD19-04116 BLD-Final3/20/20203/20/20203/20/2020 10:28:05 AMAPASS
garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD19-04116 DOC - Permit Finaled3/20/20203/20/20203/20/2020 10:27:57 AMPPASS
BLD19-02690 BLD-Final3/19/20203/20/20203/20/2020 9:58:44 AMANR
Phone #: ###-#### Inspection requested via web by Vaughn Pruett. Needs plumbing final.
BLD20-00363 BLD-Framing/Rough-in3/19/20203/20/20203/20/2020 9:58:18 AMAPASS
call and enter at back warehouse door Phone #: ###-#### Inspection requested via web by Todd Landvatter. Interior steel stud framed walls and hardlids ok.
BLD20-00218 BLD-Other3/19/20203/20/20203/20/2020 9:26:43 AMADONE
Inspection on a completed asphalt re-roof project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD20-00218 DOC - Permit Finaled3/20/20203/20/20203/20/2020 9:26:34 AMPPASS
All work appeared to be done in accordance with local codes and ordinances.
BLD19-03976 BLD-Framing/Rough-in3/19/20203/20/20203/20/2020 9:07:27 AMAPASS
Framing and shear wall for hallway portion of permit only. Fixed stairs, repaired a scabbed rafter, fir-ed out studs to meet energy code/insulation. Want to get the hallway framing/shear okayed/documented so I can hang rock on garage side before I move on to basement portion. Thanks! First thing in AM if possible. Call ###-#### en route. Phone #: ###-#### Inspection requested via web by Kyle Bilinski. ok to rock exterior side of hallway wall. All repairs were made.
BLD19-03898 BLD-Final3/19/20203/20/20203/20/2020 8:39:42 AMAPASS
nate Phone #: ###-####. Occupant load sign posted and seating installed. Ok for perm occ.
BLD19-04916 BLD-Ceiling Grid Inspection3/20/20203/20/20203/20/2020 8:25:24 AMPCANC
Phone #: ###-#### >> Inspection requested via web by Todd Landvatter Inspection cancelled from web by: Todd Landvatter