BLD18-01425
| BLD-Ceiling Grid Inspection | 3/21/2019 | 3/22/2019 | 3/22/2019 3:36:35 PM | P | PASS |
|
|
above ceiling inspection // James Phone #: ###-####. Bathroom hardlids only, Areas B and C.
|
BLD18-03942
| BLD-Final | 3/21/2019 | 3/22/2019 | 3/22/2019 3:35:53 PM | P | NR |
|
|
Will-please do as early PM as possible Phone #: ###-####. Fire/life/safety has failed.
|
BLD18-02552
| BLD-Final | 3/21/2019 | 3/22/2019 | 3/22/2019 3:35:33 PM | P | NR |
|
|
Yad Phone #: ###-####. Fire/life/safety has failed.
|
BLD19-00095
| BLD-Wall cover | 3/21/2019 | 3/22/2019 | 3/22/2019 3:35:01 PM | P | NR |
|
|
Permit had been issued but in Review status for Plan mod for adding kitchen appliances - please call Permit desk for any questions. Please call Adam for access Phone #: ###-####. Neeeds to complete airseal pack first.
|
BLD18-04557
| BLD-Framing/Rough-in | 3/22/2019 | 3/22/2019 | 3/22/2019 2:21:50 PM | P | PART |
|
|
Call ahead // Shawn Phone #: ###-####. Ok to insulate. Needs to provide approved fixes for C8,C9 and C10 trusses.
|
BLD19-00570
| BLD-Final | 3/21/2019 | 3/22/2019 | 3/22/2019 2:21:06 PM | P | PART |
|
|
after 9am // Laura Phone #: ###-####. Ok for temp occ. only.
|
BLD17-04461
| BLD-Energy code compliance | 3/22/2019 | 3/22/2019 | 3/22/2019 1:35:08 PM | P | PASS |
|
|
Thank you! Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD19-00096
| BLD-Final | 3/21/2019 | 3/22/2019 | 3/22/2019 1:25:45 PM | P | DONE |
|
|
Matt Phone #: ###-####
|
BLD19-00096
| DOC - Permit Finaled | 3/22/2019 | 3/22/2019 | 3/22/2019 1:25:22 PM | P | PASS |
|
|
|
BLD18-03836
| BLD-Ceiling Grid Inspection | 3/21/2019 | 3/22/2019 | 3/22/2019 1:13:51 PM | P | CANC |
|
|
Eric Phone #: ###-####
|
BLD18-03836
| BLD-Energy code compliance | 3/22/2019 | 3/22/2019 | 3/22/2019 1:13:27 PM | P | PART |
|
|
Eric Phone #: ###-####. Patio enclosure. Walls only ok to cover. Per the report for foam insulation, it appears that a thermal barrier is required. Will need to provide a thermal barrier or show that the 3/4 inch tongue and grove cedar will meet a 15minute barrier per NFPA 275.
|
BLD19-00269
| BLD-Final | 3/21/2019 | 3/22/2019 | 3/22/2019 11:07:54 AM | A | PASS |
|
|
Mark Phone #: ###-####. OK for perm occ. Also reviewed letter from SMBH Structural engineers noting that the existing roof framing is adequate to support the new RTU. New RTU installed and existing curbing was used.
|
BLD18-04539
| BLD-Framing/Rough-in | 3/21/2019 | 3/22/2019 | 3/22/2019 10:53:29 AM | A | PASS |
|
|
Requested by Shane Treasure Phone #: ###-#### Inspection requested via web by Shane Treasure. Upper exterior facade frming south east corner of building ok.
|
BLD17-04447
| BLD-Energy code compliance | 3/21/2019 | 3/22/2019 | 3/22/2019 10:31:06 AM | A | PASS |
|
|
Hello Mike insulation exterior walls for cover, north wing 2nd floor Phone #: ###-#### Inspection requested via web by Jim Carriveau. 2nd floor, north wing exterior walls ok.
|
BLD19-00715
| BLD-Footing | 3/21/2019 | 3/22/2019 | 3/22/2019 10:06:30 AM | A | PART |
|
|
Call Dan at listed number Phone #: ###-#### Inspection requested via web by Rachael Moore. Needs to provide 3 inch clearance for reinforcement. Contractor has taller chairs and will install them. Ok to place concrete after new chairs installed.
|
BLD18-04028
| BLD-Final | 3/21/2019 | 3/22/2019 | 3/22/2019 9:35:45 AM | A | PASS |
|
|
Daniel Phone #: ###-####
|
BLD18-04028
| DOC - Permit Finaled | 3/22/2019 | 3/22/2019 | 3/22/2019 9:35:36 AM | P | PASS |
|
|
Handrail issues resolved.
|
BLD18-04027
| BLD-Final | 3/21/2019 | 3/22/2019 | 3/22/2019 9:35:06 AM | A | PASS |
|
|
Daniel Phone #: ###-####
|
BLD18-04027
| DOC - Permit Finaled | 3/22/2019 | 3/22/2019 | 3/22/2019 9:34:57 AM | P | PASS |
|
|
Handrail issues resolved.
|
BLD18-04026
| BLD-Final | 3/21/2019 | 3/22/2019 | 3/22/2019 9:34:23 AM | A | PASS |
|
|
Daniel Phone #: ###-####
|
BLD18-04026
| DOC - Permit Finaled | 3/22/2019 | 3/22/2019 | 3/22/2019 9:34:16 AM | P | PASS |
|
|
Handrail issues resolved.
|
BLD18-04030
| BLD-Final | 3/21/2019 | 3/22/2019 | 3/22/2019 9:26:37 AM | A | PEND |
|
|
Daniel Phone #: ###-####. Handrail ok. Will be ok to final once plumbing has finaled.
|
BLD19-00397
| BLD-Footing | 3/20/2019 | 3/22/2019 | 3/22/2019 9:12:35 AM | A | PART |
|
|
pouring at 11 // Victor Phone #: ###-####
|
BLD18-00776
| BLD-Framing/Rough-in | 3/21/2019 | 3/22/2019 | 3/22/2019 9:02:04 AM | A | PASS |
|
|
Charlie Phone #: ###-####. Interior steel stud framed walls for resrooms, storage rooms off of gym between grids 2 and 3.
|
BLD18-02829
| BLD-Final | 3/21/2019 | 3/22/2019 | 3/22/2019 8:34:01 AM | A | PASS |
|
|
Emailed special inspection report to Brandon Shaw 3/21/19 at 106pm Phone #: ###-#### Inspection requested via web by Cassandra Hessing
|
BLD18-02829
| DOC - Permit Finaled | 3/22/2019 | 3/22/2019 | 3/22/2019 8:33:50 AM | P | PASS |
|
|
Special inspection report has been recieved and reviewed.
|
BLD18-00578
| BLD-Wall cover | 3/21/2019 | 3/22/2019 | 3/22/2019 8:30:19 AM | A | PASS |
|
|
Fire Stop at Fireplace Compete! Phone #: ###-#### Inspection requested via web by Chris Laraway
|
BLD18-00578
| BLD-Energy code compliance | 3/22/2019 | 3/22/2019 | 3/22/2019 8:30:12 AM | A | PASS |
|
|
Fire Stop at Fireplace Compete! Phone #: ###-#### Inspection requested via web by Chris Laraway
|
BLD19-00715
| BLD-Footing | 3/21/2019 | 3/22/2019 | 3/21/2019 5:21:04 PM | P | CANC |
|
|
Please call Dan to schedule Phone #: ###-#### >> Inspection requested via web by Rachael Moore Inspection cancelled from web by: Rachael Moore
|