Inspections for the day of: Monday, March 25, 2019.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-03628 BLD-Final3/25/20193/25/20193/25/2019 3:54:51 PMPPASS
Garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD18-03628 DOC - Permit Finaled3/25/20193/25/20193/25/2019 3:54:42 PMPPASS
All issus resolved.
BLD18-03628 BLD-Blower Door Test Results3/25/20193/25/20193/25/2019 3:54:29 PMPDONE
4.2ACH @50pa
BLD17-04387 BLD-Wall Bracing3/25/20193/25/20193/25/2019 3:23:19 PMPPASS
Framers are on site with plans Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD18-03023 BLD-Final3/22/20193/25/20193/25/2019 2:27:51 PMPPASS
Call prior to going Phone #: 6027037603 >> Inspection requested via mobile web by Matthew Jimenez
BLD18-03023 DOC - Permit Finaled3/25/20193/25/20193/25/2019 2:27:41 PMPPASS
BLD19-00143 BLD-Final3/25/20193/25/20193/25/2019 1:48:27 PMPPASS
Mike,

Lockbox code is 9701. I scheduled Troy today also for fire. Phone #: ###-#### Inspection requested via web by Todd Kurns. OK for perm occ.
BLD19-00470 BLD-Framing/Rough-in3/25/20193/25/20193/25/2019 1:30:43 PMPFAIL
Ed Phone #: ###-####. Repairs done incorrectly. Went over plans with contractor on how to install the blocking and A35's.
BLD18-03395 BLD-Final3/25/20193/25/20193/25/2019 10:29:19 AMPCANC
Garage door code is 2468 Phone #: ###-#### >> Inspection requested via web by Joel Hirtle Inspection cancelled from web by: Joel Hirtle
BLD19-00729 BLD-Footing3/22/20193/25/20193/25/2019 10:26:01 AMAPASS
Travis Phone #: ###-####. footings for new garage ok.
BLD18-03849 BLD-Final3/22/20193/25/20193/25/2019 9:16:34 AMAPART
Please call JP before at ###-####. Phone #: ###-#### Inspection requested via web by Mattie Botero. Ok for temp occ. Per the contractor, no mech. work needed to be completed. need plumbing final
BLD18-03684 BLD-Framing/Rough-in3/22/20193/25/20193/25/2019 9:01:41 AMAPASS
Brian Phone #: ###-####. Interior steel stud framed walls for phase 2, restrooms and locker rooms ok.
BLD19-00470 BLD-Framing/Rough-in3/22/20193/25/20193/25/2019 8:36:51 AMAFAIL
Ed Phone #: ###-####. Needs to install blocking at every other truss and connect with 2 A35's per the approved drawings and engineering.