Inspections for the day of: Tuesday, March 26, 2019.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-02644 BLD-Final3/26/20193/26/20193/26/2019 3:58:03 PMPNR
Jason Phone #: ###-####
BLD18-04539 BLD-Framing/Rough-in3/25/20193/26/20193/26/2019 3:15:36 PMPPASS
Requested by Shane Treasure Phone #: ###-#### Inspection requested via web by Shane Treasure. south west exterior facade and canopy framing ok. Interior franing for enclosure of riser room.
BLD18-02552 BLD-Final3/25/20193/26/20193/26/2019 2:58:44 PMPPASS
Iad Phone #: ###-####. Ok for perm occ.as per Mike Jordan-no oven put in so venting was done.
BLD18-04392 BLD-Framing/Rough-in3/25/20193/26/20193/26/2019 2:24:45 PMPFAIL
Gari Phone #: ###-####. Provide fireblocking at fireplace fur out at ceiling level, fur down and fur out 2x4 wall at main entry hallway and at ceiling level upsatirs at dryer vent. Install missing strapson tall wall per the engineering. provide tempered glazing in window next to shower/tub. strap double top plate breaks upstairs, north wall. Studs shall also be continous, north wall upstairs. provide additional 2x6 blocking underneath truss bearing, east wall upstairs. Install purlins on T9 trusses (two next to T10 truss) were the roof sheathing has been omitted. provide additional info on T6 trusses upstairs? Correction notice posted. ok to insulate.
BLD18-01144 BLD-Final3/25/20193/26/20193/26/2019 12:21:40 PMANR
Swimming Pool Final Inspection
Phone #: ###-#### Inspection requested via web by Brandy McConkey. Still need electrical final prior to bldg. final.
ESC19-00040 Site Final3/26/20193/26/20193/26/2019 10:19:11 AMADONE
ESC19-00040 DOC - Permit Finaled3/26/20193/26/20193/26/2019 10:19:03 AMPPASS
MIS19-00011 BLD-Final3/26/20193/26/20193/26/2019 10:18:52 AMAPASS
MIS19-00011 DOC - Permit Finaled3/26/20193/26/20193/26/2019 10:18:44 AMPPASS
BLD19-00166 BLD-Final3/25/20193/26/20193/26/2019 10:18:30 AMAPASS
John ###-####
BLD19-00166 DOC - Permit Finaled3/26/20193/26/20193/26/2019 10:18:22 AMPPASS
BLD18-03836 BLD-Wall cover3/25/20193/26/20193/26/2019 10:00:57 AMAPASS
eric Phone #: ###-####. Ok to cover patio area toungue and groove planking is acceptable.
BLD19-00470 BLD-Framing/Rough-in3/25/20193/26/20193/26/2019 9:27:39 AMAPASS
Ed Phone #: ###-####
BLD19-00095 BLD-Wall cover3/25/20193/26/20193/26/2019 9:14:00 AMACANC
Adam- wall cover -in Review status due to plan mod- adding appliances to kitchen Phone #: ###-####
BLD19-00095 BLD-Framing/Rough-in3/26/20193/26/20193/26/2019 9:13:52 AMAPASS
Adam- wall cover -in Review status due to plan mod- adding appliances to kitchen Phone #: ###-####
BLD18-04557 BLD-Framing/Rough-in3/25/20193/26/20193/26/2019 8:29:06 AMAPASS
reinspect and insulation // Shawn
BLD18-04557 BLD-Energy code compliance3/26/20193/26/20193/26/2019 8:28:56 AMAPASS
reinspect and insulation // Shawn