BLD20-00115
| BLD-Framing/Rough-in | 3/27/2020 | 3/27/2020 | 3/27/2020 4:40:22 PM | P | CANC |
|
|
allan Phone #: ###-####
|
BLD19-03316
| BLD-Final | 3/27/2020 | 3/27/2020 | 3/27/2020 4:40:11 PM | P | CANC |
|
|
|
BLD19-01264
| BLD-Framing/Rough-in | 3/27/2020 | 3/27/2020 | 3/27/2020 4:39:56 PM | P | PASS |
|
|
|
BLD19-01264
| BLD-Framing/Rough-in | 3/27/2020 | 3/27/2020 | 3/27/2020 4:39:42 PM | P | CANC |
|
|
|
BLD20-00076
| BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 3:56:00 PM | P | FAIL |
|
|
requesting framing and air seal inspection. access is lock box code 7777, located to left of garage doors attached to water spigot. Permit located in garage on south wall. Thank you Phone #: ###-#### Inspection requested via web by Dean Rhodes. Fireblock mech. chase at ceiling on main level. Strap double top plate break at new to existing framing by main door. Fire block all fir downs and fir outs in basement. Correction notice posted. Ok to insulate.
|
BLD20-00115
| BLD-Energy code compliance | 3/27/2020 | 3/27/2020 | 3/27/2020 2:56:49 PM | P | PASS |
|
|
allan Phone #: ###-####
|
BLD19-04307
| BLD-Final | 3/26/2020 | 3/27/2020 | 3/27/2020 2:46:49 PM | P | FAIL |
|
|
any problems w/ access please call Dean Rhodes ###-####. Final electrical inspection today and final plumbing inspection tomorrow morning, if either of these fail please cancel inspection and please notify me, thank you Phone #: ###-#### Inspection requested via web by Dean Rhodes. Provide code compliant guards and handrail on exterior stairs. Engineering required on cable guards. Provide CO detectors upstairs and downstairs.
|
BLD17-02922
| BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 2:12:01 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by John Rott
|
BLD20-00152
| BLD-Energy code compliance | 3/26/2020 | 3/27/2020 | 3/27/2020 1:52:24 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD20-00152
| BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 1:52:05 PM | P | NR |
|
|
Inspection requested via web by Joel Hirtle
|
BLD20-00273
| BLD-Conference | 3/27/2020 | 3/27/2020 | 3/27/2020 1:24:24 PM | P | DONE |
|
|
didn''t leave name Phone #: ###-####
|
BLD20-00222
| BLD-Footing | 3/26/2020 | 3/27/2020 | 3/27/2020 11:50:21 AM | A | DEFR |
|
|
pat Phone #: ###-####. Concrete for footings already placed. Contractor accepts all responsibility for foundation system
|
BLD20-00527
| BLD-Footing | 3/27/2020 | 3/27/2020 | 3/27/2020 11:27:38 AM | A | DEFR |
|
|
moved to pm inspection.
|
BLD20-00775
| BLD-Footing | 3/26/2020 | 3/27/2020 | 3/27/2020 11:27:18 AM | A | DEFR |
|
|
greg Phone #: ###-####. Moved to pm inspection.
|
BLD19-01264
| BLD-Framing/Rough-in | 3/23/2020 | 3/27/2020 | 3/27/2020 11:26:56 AM | A | DEFR |
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall. Moved to pm inspection.
|
GRD19-00093
| GRD-Other | 3/24/2020 | 3/27/2020 | 3/27/2020 11:22:02 AM | A | PART |
|
|
rebar // angela Phone #: ###-####. Work in progress on rebar install. Ok to place concrete pending special inspection approval.
|
BLD20-00527
| BLD-Foundation | 3/25/2020 | 3/27/2020 | 3/27/2020 11:21:13 AM | A | CANC |
|
|
Brant Phone #: ###-####. Work in progress on retaing wall rebar. wrong entry.
|
BLD20-00821
| BLD-Foundation | 3/26/2020 | 3/27/2020 | 3/27/2020 9:48:44 AM | A | PART |
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell. Noted that stemwall placement does not met the projection in some areas. Will need to dowel footing and provide addtional footing .
|
BLD19-04921
| BLD-Foundation | 3/26/2020 | 3/27/2020 | 3/27/2020 9:33:13 AM | A | PASS |
|
|
steel. any time 10:00 on. Phone #: ###-#### Inspection requested via web by Todd Landvatter. Interior slab on grade ok.
|
BLD19-01513
| BLD-Final | 3/26/2020 | 3/27/2020 | 3/27/2020 9:09:50 AM | A | PASS |
|
|
Call when in route please. Thank you. Entry Code 4646 Phone #: ###-#### Inspection requested via web by Chris Laraway
|
BLD19-01513
| DOC - Permit Finaled | 3/27/2020 | 3/27/2020 | 3/27/2020 9:09:41 AM | P | PASS |
|
|
All issues have been resolved. Ok for perm occ.
|
BLD19-03316
| BLD-Final | 3/26/2020 | 3/27/2020 | 3/27/2020 8:57:27 AM | A | CANC |
|
|
Please call before arrival. Project is behind locked gates and no superintendent is on site. I am 15 minutes from the job site. Phone #: ###-#### Inspection requested via web by Ian Franklin. Moved to pm inspection.
|
BLD20-00151
| BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 8:54:05 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs mech. and electrical rough in in inspections.
|
BLD20-00261
| BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 8:53:01 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD19-04921
| BLD-Foundation | 3/26/2020 | 3/27/2020 | 3/26/2020 11:37:43 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Todd Landvatter Inspection cancelled from web by: Todd Landvatter
|