BLD18-02914
| BLD-Final | 3/5/2019 | 3/6/2019 | | A | |
|
|
please call for garage code Phone #: ###-#### >> Inspection requested via web by anthony boyd
|
BLD18-02176
| BLD-Footing | 3/8/2019 | 3/8/2019 | 3/8/2019 4:54:35 PM | P | PASS |
|
|
Exterior column pad footings on grtidlline 7.
|
BLD19-00282
| BLD-Foundation | 3/7/2019 | 3/8/2019 | 3/8/2019 3:26:55 PM | P | PART |
|
|
Eric Phone #: ###-####
|
BLD18-04076
| BLD-Footing | 3/7/2019 | 3/8/2019 | 3/8/2019 2:51:40 PM | P | PASS |
|
|
to include UFER inspection Phone #: ###-#### Inspection requested via web by chad stradley. South retaing wall footing, building 8A.
|
BLD19-00412
| BLD-Foundation | 3/8/2019 | 3/8/2019 | 3/8/2019 2:21:00 PM | P | PART |
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD18-04557
| BLD-Wall Bracing | 3/8/2019 | 3/8/2019 | 3/8/2019 1:51:25 PM | P | FAIL |
|
|
Shawn Phone #: ###-####. Provide the engineering. Install missed hardware for the drag truss. Install the missed holdowns, HDU5 and DTT2Z, and sheet the walls and nail per the schedule. bedroom #2 should have a portal. Correction notice posted.
|
BLD17-04447
| BLD-Energy code compliance | 3/7/2019 | 3/8/2019 | 3/8/2019 1:10:52 PM | A | PASS |
|
|
first floor exterior wall insulation Phone #: ###-#### Inspection requested via web by Jim Carriveau. 1st. floor.
|
BLD17-04447
| BLD-Framing/Rough-in | 3/8/2019 | 3/8/2019 | 3/8/2019 1:10:37 PM | P | FAIL |
|
|
first floor exterior wall insulation Phone #: ###-#### Inspection requested via web by Jim Carriveau. Spray faom insulation requires an ignition barrier.
|
BLD18-03536
| BLD-Final | 3/7/2019 | 3/8/2019 | 3/8/2019 1:09:18 PM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Laurie Hoelscher
|
BLD18-03536
| DOC - Permit Finaled | 3/8/2019 | 3/8/2019 | 3/8/2019 12:19:13 PM | P | PASS |
|
|
|
MIS19-00061
| BLD-Conference | 3/5/2019 | 3/8/2019 | 3/8/2019 10:40:14 AM | A | DONE |
|
|
Check on status... Plans have been submitted and is under review.
|
BLD18-03836
| BLD-Framing/Rough-in | 3/7/2019 | 3/8/2019 | 3/8/2019 9:44:35 AM | A | PART |
|
|
Eric if not there ask for Chris Laborde Phone #: ###-####. Interior wood framed wall for new sliding glass doors. Ok to one side. Needs to provide the attached engineering.
|
BLD18-02176
| BLD-Footing | 3/4/2019 | 3/8/2019 | 3/8/2019 9:26:42 AM | A | CANC |
|
|
Early AM Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD18-04399
| BLD-Framing/Rough-in | 3/7/2019 | 3/8/2019 | 3/8/2019 9:08:23 AM | A | FAIL |
|
|
Kai Phone #: ###-####. Remove tyvek for wall bracing inspection. Previous nspections have failed due to not all sheathing being installed, staples used in portal frame areas and several areas not attached.
|
BLD18-04392
| BLD-Wall Bracing | 3/7/2019 | 3/8/2019 | 3/8/2019 9:03:22 AM | A | PASS |
|
|
Juan Phone #: ###-####
|