MIS16-00397
| BLD-Conference | 1/20/2017 | 3/3/2017 | | A | |
|
|
Check on progres/status.
|
BLD16-04169
| BLD-Footing | 3/8/2017 | 3/9/2017 | 3/9/2017 3:59:52 PM | P | CANC |
|
|
Colton Phone #: ###-####
|
BLD16-04169
| BLD-Energy code compliance | 3/9/2017 | 3/9/2017 | 3/9/2017 3:08:03 PM | P | PASS |
|
|
Colton Phone #: ###-####. rigid insulation on foundation under slab on grade.
|
BLD17-00347
| BLD-Conference | 3/9/2017 | 3/9/2017 | 3/9/2017 3:06:38 PM | P | DONE |
|
|
Russ Phone #: ###-####. Provide lever hardware on required exits.
|
BLD16-02880
| BLD-Framing/Rough-in | 3/9/2017 | 3/9/2017 | 3/9/2017 2:29:20 PM | P | FAIL |
|
|
Brett Phone #: ###-####. Provide purlin on top chord of A3 truss were roof sheating has been left off. Complete lateral bracing on A3, A5 and B3 trusses. Install the RTU connectors for uplift on gable end B1 as noted on truss engineering. Ok to insulate. Ok to insulate.
|
BLD16-03361
| BLD-Footing | 3/8/2017 | 3/9/2017 | 3/9/2017 1:36:16 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD16-04586
| BLD-Footing | 3/7/2017 | 3/9/2017 | 3/9/2017 10:22:17 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ken Litzinger
|
BLD16-04493
| BLD-Energy code compliance | 3/8/2017 | 3/9/2017 | 3/9/2017 9:45:38 AM | A | PASS |
|
|
dave Phone #: ###-####
|
BLD16-04369
| BLD-Final | 3/8/2017 | 3/9/2017 | 3/9/2017 9:24:54 AM | A | DONE |
|
|
Justin Hamby Phone #: ###-#### Inspection requested via web by Laurie Hoelscher
|
BLD16-04369
| DOC - Permit Finaled | 3/9/2017 | 3/9/2017 | 3/9/2017 9:24:45 AM | P | PASS |
|
|
|
BLD16-02899
| BLD-Other | 3/8/2017 | 3/9/2017 | 3/9/2017 8:44:13 AM | A | PASS |
|
|
Roof nailing - Herb Phone #: ###-####. North wing, south side ok to cover.
|