Inspections for the day of: Tuesday, April 14, 2020.
Number of inspections: 15
Percentage of inspections complete: 93 %
Percentage of inspections not complete: 7 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-01027 BLD-Conference4/1/20204/8/2020 A 
BLD19-04634 BLD-Footing4/13/20204/14/20204/14/2020 3:32:07 PMPPART
Dane Phone #: ###-####
BLD20-00568 BLD-Footing4/13/20204/14/20204/14/2020 3:03:03 PMPPART
Screened // Pat Phone #: ###-####
BLD20-00569 BLD-Footing4/13/20204/14/20204/14/2020 3:02:50 PMPPART
Screened // Pat Phone #: ###-####
BLD20-00567 BLD-Footing4/13/20204/14/20204/14/2020 3:02:37 PMPPART
Screened // Pat Phone #: ###-####
BLD20-00566 BLD-Footing4/13/20204/14/20204/14/2020 3:02:23 PMPPART
Screened // Pat Phone #: ###-####
BLD20-00559 BLD-Footing4/13/20204/14/20204/14/2020 3:02:05 PMPPART
Screened // Pat Phone #: ###-####
BLD20-00481 BLD-Framing/Rough-in4/14/20204/14/20204/14/2020 1:50:54 PMPFAIL
Screened- home is vacant- virtual inspection ok- Noah Phone #: ###-####. Provide truss engineering. Strap double top plate breaks from addition to existing. 3 ply G02 truss, plys not in contact. Appears to be insufficient bearing on 6x6 G01 truss. Need truss engineering to verify.. Correction notice posted. Ok to insulate.
BLD19-02464 BLD-Framing/Rough-in4/14/20204/14/20204/14/2020 1:45:18 PMPPASS
Ed **Cleared** Phone #: ###-####. 1st and 2nd. floor.
BLD17-02922 BLD-Framing/Rough-in4/13/20204/14/20204/14/2020 1:44:41 PMPPASS
video/photo ok // John Phone #: ###-####
BLD20-00658 BLD-Framing/Rough-in4/13/20204/14/20204/14/2020 10:02:40 AMAPASS
Phone #: ###-#### Inspection requested via web by Todd Landvatter
BLD20-00663 BLD-Framing/Rough-in4/13/20204/14/20204/14/2020 9:15:40 AMAPASS
call ahead video/photo ok // Byon Phone #: ###-####
BLD18-04519 BLD-Energy code compliance4/13/20204/14/20204/13/2020 1:57:31 PMACANC
Building 10 Insulation, Vapor Barrier & RC Channel for cover Phone #: ###-#### >> Inspection requested via web by Bob Goodwin Inspection cancelled from web by: Bob Goodwin
BLD20-01104 BLD-Framing/Rough-in4/10/20204/14/20204/13/2020 9:46:10 AMACANC
Inspection requested 4/14 AM, First AM if at all possible please, footings and framing ready day prior. Footing inspection requested simultaneously. Phone #: ###-#### >> Inspection requested via web by David Dexter Inspection cancelled from web by: David Dexter
BLD20-01104 BLD-Footing4/10/20204/14/20204/13/2020 9:46:08 AMACANC
Inspection requested 4/14 AM, First AM if at all possible please, footings and framing ready day prior. Framing inspection requested simultaneously. Phone #: ###-#### >> Inspection requested via web by David Dexter Inspection cancelled from web by: David Dexter