BLD17-00973
| BLD-Final | 4/14/2017 | 4/17/2017 | 4/18/2017 7:55:13 AM | P | NR |
|
|
Call an hour before // marcus Phone #: ###-####
|
BLD17-00417
| BLD-Final | 4/14/2017 | 4/17/2017 | 4/17/2017 4:19:01 PM | P | DONE |
|
|
Justin Hamby Phone #: ###-#### Inspection requested via web by Laurie Hoelscher
|
BLD17-00417
| DOC - Permit Finaled | 4/17/2017 | 4/17/2017 | 4/17/2017 4:13:45 PM | P | PASS |
|
|
|
ESC16-01515
| Site Final | 4/17/2017 | 4/17/2017 | 4/17/2017 3:54:52 PM | P | DONE |
|
|
|
ESC16-01515
| DOC - Permit Finaled | 4/17/2017 | 4/17/2017 | 4/17/2017 3:54:44 PM | P | PASS |
|
|
|
BLD16-04089
| BLD-Final | 4/17/2017 | 4/17/2017 | 4/17/2017 3:54:33 PM | P | PASS |
|
|
Mike Phone #: ###-####
|
BLD16-04089
| DOC - Permit Finaled | 4/17/2017 | 4/17/2017 | 4/17/2017 3:54:25 PM | P | PASS |
|
|
|
ESC16-01520
| Site Final | 4/17/2017 | 4/17/2017 | 4/17/2017 3:54:17 PM | P | DONE |
|
|
|
ESC16-01520
| DOC - Permit Finaled | 4/17/2017 | 4/17/2017 | 4/17/2017 3:54:10 PM | P | PASS |
|
|
|
BLD16-04088
| BLD-Final | 4/17/2017 | 4/17/2017 | 4/17/2017 3:54:02 PM | P | PASS |
|
|
Mike Phone #: ###-####
|
BLD16-04088
| DOC - Permit Finaled | 4/17/2017 | 4/17/2017 | 4/17/2017 3:53:52 PM | P | PASS |
|
|
|
BLD17-00401
| BLD-Foundation | 4/17/2017 | 4/17/2017 | 4/17/2017 3:26:45 PM | P | DEFR |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD17-00310
| BLD-Foundation | 4/17/2017 | 4/17/2017 | 4/17/2017 3:26:33 PM | P | DEFR |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD16-01070
| BLD-Final | 4/17/2017 | 4/17/2017 | 4/17/2017 3:05:41 PM | P | PART |
|
|
Phil Phone #: ###-####. All intumescent paint is completed for 2hr. fire walls and mill thicknesses verified by MTI. 3hr. fire wall completed on nerfed side, Need to complete on useful glassworks side.
|
BLD16-02734
| BLD-Final | 4/17/2017 | 4/17/2017 | 4/17/2017 3:03:26 PM | P | PART |
|
|
Phil Phone #: ###-####. OK for temp occ. the work on the 2hr. fire walls is completed. All mill thicknesses verified by special inspection. The 3hr. wall is completed on the nerfed side. Will be ok for perm occ. once the remainder of the 3hr. wall is completed on the usful glassworks side. All other issues for this tenant have been resolved.
|
BLD16-03500
| BLD-Framing/Rough-in | 4/14/2017 | 4/17/2017 | 4/17/2017 2:21:46 PM | P | PASS |
|
|
Troy Phone #: ###-####
|
BLD17-00651
| BLD-Conference | 4/17/2017 | 4/17/2017 | 4/17/2017 2:10:26 PM | P | DONE |
|
|
James Phone #: ###-####
|
BLD16-03327
| BLD-Wall cover | 4/14/2017 | 4/17/2017 | 4/17/2017 1:38:06 PM | P | PASS |
|
|
Joseph Phone #: ###-####. All issues resolved. ok to insulate.
|
BLD17-00672
| BLD-Footing | 4/14/2017 | 4/17/2017 | 4/17/2017 1:25:00 PM | P | NR |
|
|
Dane Phone #: ###-####. No one on site, footings not yet excavated.
|
BLD17-00637
| BLD-Foundation | 4/14/2017 | 4/17/2017 | 4/17/2017 1:22:52 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD17-00862
| BLD-Footing | 4/14/2017 | 4/17/2017 | 4/17/2017 11:06:31 AM | A | PASS |
|
|
Kelly Phone #: ###-####
|
BLD17-00925
| BLD-Footing | 4/14/2017 | 4/17/2017 | 4/17/2017 10:44:52 AM | A | PASS |
|
|
pool steel inspection Phone #: ###-#### Inspection requested via web by Justin Brewer
|
BLD16-04251
| BLD-Wall Bracing | 4/14/2017 | 4/17/2017 | 4/17/2017 10:34:20 AM | A | PASS |
|
|
would like call ahead; Tim Phone #: ###-####
|
BLD17-00735
| BLD-Footing | 4/14/2017 | 4/17/2017 | 4/17/2017 10:06:17 AM | A | PART |
|
|
Matt Phone #: ###-####. Work in progress on installing reinforcement.
|
BLD16-00124
| BLD-Framing/Rough-in | 4/14/2017 | 4/17/2017 | 4/17/2017 9:53:24 AM | A | PART |
|
|
partial framing (n/a plan mod scope)// Ron Wood Phone #: ###-####. South wing framing only. ok to cover walls except for interior shear walls. Contractor needs additional details. Interior shear walls constructed of steel studs in leiu of wood studs. Needs to provide connections to underfloor as shown or provide alternate from engineer. Will also need additional detail for mech. ducts through CMU wall.
|
BLD16-02650
| BLD-Wall Bracing | 4/14/2017 | 4/17/2017 | 4/17/2017 9:02:32 AM | A | PASS |
|
|
rc1 channel ste 101 102 201 202 // Pat Phone #: ###-####
|
BLD17-00640
| BLD-Footing | 4/14/2017 | 4/17/2017 | 4/17/2017 8:44:25 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sheila Meyers
|