MIS20-00122
| BLD-Conference | 4/20/2020 | 4/21/2020 | 4/21/2020 4:26:57 PM | A | DONE |
|
|
|
MIS20-00122
| DOC - Permit Finaled | 4/21/2020 | 4/21/2020 | 4/21/2020 4:26:49 PM | P | PASS |
|
|
noted no work at time of site visit.
|
BLD20-00404
| BLD-Footing | 4/20/2020 | 4/21/2020 | 4/21/2020 4:25:07 PM | P | CANC |
|
|
Screened-BLAin Phone #: ###-####
|
BLD20-00403
| BLD-Footing | 4/20/2020 | 4/21/2020 | 4/21/2020 4:24:58 PM | P | CANC |
|
|
Screened-BLAin Phone #: ###-####
|
BLD20-00402
| BLD-Footing | 4/20/2020 | 4/21/2020 | 4/21/2020 4:24:48 PM | P | CANC |
|
|
Screened-BLAin Phone #: ###-####
|
BLD20-00373
| BLD-Footing | 4/20/2020 | 4/21/2020 | 4/21/2020 4:24:33 PM | P | CANC |
|
|
Screened-BLAin Phone #: ###-####
|
BLD20-00493
| BLD-Foundation | 4/20/2020 | 4/21/2020 | 4/21/2020 1:58:54 PM | P | PART |
|
|
Screened-BLAin Phone #: ###-####
|
BLD20-00492
| BLD-Foundation | 4/20/2020 | 4/21/2020 | 4/21/2020 1:58:39 PM | P | PASS |
|
|
Screened-BLAin Phone #: ###-####
|
BLD20-00491
| BLD-Foundation | 4/20/2020 | 4/21/2020 | 4/21/2020 1:58:21 PM | P | PASS |
|
|
Screened-BLAin Phone #: ###-####
|
BLD20-00372
| BLD-Foundation | 4/20/2020 | 4/21/2020 | 4/21/2020 1:58:00 PM | A | PASS |
|
|
Screened-BLAin Phone #: ###-####
|
BLD19-04658
| BLD-Foundation | 4/21/2020 | 4/21/2020 | 4/21/2020 1:57:40 PM | P | CANC |
|
|
insulation // Kenny Phone #: ###-####
|
BLD20-00426
| BLD-Foundation | 4/21/2020 | 4/21/2020 | 4/21/2020 1:57:31 PM | P | CANC |
|
|
insulation // Kenny Phone #: ###-####
|
BLD19-04657
| BLD-Foundation | 4/21/2020 | 4/21/2020 | 4/21/2020 1:57:21 PM | P | CANC |
|
|
insulation // Kenny Phone #: ###-####
|
BLD20-00425
| BLD-Foundation | 4/21/2020 | 4/21/2020 | 4/21/2020 1:57:10 PM | P | CANC |
|
|
insulation // Kenny Phone #: ###-####
|
BLD19-04656
| BLD-Foundation | 4/21/2020 | 4/21/2020 | 4/21/2020 1:57:00 PM | P | CANC |
|
|
insulation // Kenny Phone #: ###-####
|
BLD20-00424
| BLD-Foundation | 4/21/2020 | 4/21/2020 | 4/21/2020 1:56:49 PM | P | CANC |
|
|
insulation // Kenny Phone #: ###-####
|
BLD19-04655
| BLD-Foundation | 4/21/2020 | 4/21/2020 | 4/21/2020 1:56:39 PM | P | CANC |
|
|
insulation // Kenny Phone #: ###-####
|
BLD20-00423
| BLD-Foundation | 4/21/2020 | 4/21/2020 | 4/21/2020 1:56:28 PM | P | CANC |
|
|
insulation // Kenny Phone #: ###-####
|
BLD19-04654
| BLD-Foundation | 4/21/2020 | 4/21/2020 | 4/21/2020 1:56:18 PM | P | CANC |
|
|
insulation // Kenny Phone #: ###-####
|
BLD19-04638
| BLD-Foundation | 4/21/2020 | 4/21/2020 | 4/21/2020 1:56:07 PM | P | CANC |
|
|
insulation // Kenny Phone #: ###-####
|
BLD20-00422
| BLD-Foundation | 4/21/2020 | 4/21/2020 | 4/21/2020 1:55:55 PM | P | CANC |
|
|
insulation // Kenny Phone #: ###-####
|
BLD20-00371
| BLD-Foundation | 4/21/2020 | 4/21/2020 | 4/21/2020 1:55:42 PM | P | CANC |
|
|
insulation // Kenny Phone #: ###-####
|
BLD19-04634
| BLD-Foundation | 4/21/2020 | 4/21/2020 | 4/21/2020 1:55:29 PM | P | CANC |
|
|
insulation // Kenny Phone #: ###-####
|
BLD20-00427
| BLD-Foundation | 4/21/2020 | 4/21/2020 | 4/21/2020 1:55:15 PM | P | CANC |
|
|
insulation // Kenny Phone #: ###-####
|
BLD20-00427
| BLD-Energy code compliance | 4/21/2020 | 4/21/2020 | 4/21/2020 1:55:07 PM | P | PASS |
|
|
insulation // Kenny Phone #: ###-####. rigid insulation at interior side of stemwall under slab on grade
|
BLD20-00427
| BLD-Energy code compliance | 4/21/2020 | 4/21/2020 | 4/21/2020 1:54:26 PM | P | PASS |
|
|
insulation // Kenny Phone #: ###-####. rigid insulation at interior side of stemwall under slab on grade
|
BLD19-04658
| BLD-Energy code compliance | 4/21/2020 | 4/21/2020 | 4/21/2020 1:54:04 PM | P | PASS |
|
|
insulation // Kenny Phone #: ###-####. rigid insulation at interior side of stemwall under slab on grade
|
BLD20-00426
| BLD-Energy code compliance | 4/21/2020 | 4/21/2020 | 4/21/2020 1:53:41 PM | P | PASS |
|
|
insulation // Kenny Phone #: ###-####. rigid insulation at interior side of stemwall under slab on grade
|
BLD19-04657
| BLD-Energy code compliance | 4/21/2020 | 4/21/2020 | 4/21/2020 1:53:18 PM | P | PASS |
|
|
insulation // Kenny Phone #: ###-####. rigid insulation at interior side of stemwall under slab on grade
|
BLD20-00425
| BLD-Energy code compliance | 4/21/2020 | 4/21/2020 | 4/21/2020 1:52:44 PM | P | PASS |
|
|
insulation // Kenny Phone #: ###-####. rigid insulation at interior side of stemwall under slab on grade
|
BLD19-04656
| BLD-Energy code compliance | 4/21/2020 | 4/21/2020 | 4/21/2020 1:52:23 PM | P | PASS |
|
|
insulation // Kenny Phone #: ###-####. rigid insulation at interior side of stemwall under slab on grade
|
BLD20-00424
| BLD-Energy code compliance | 4/21/2020 | 4/21/2020 | 4/21/2020 1:51:52 PM | P | PASS |
|
|
insulation // Kenny Phone #: ###-####. rigid insulation at interior side of stemwall under slab on grade
|
BLD19-04655
| BLD-Energy code compliance | 4/21/2020 | 4/21/2020 | 4/21/2020 1:51:26 PM | P | PASS |
|
|
insulation // Kenny Phone #: ###-####. rigid insulation at interior side of stemwall under slab on grade
|
BLD20-00423
| BLD-Energy code compliance | 4/21/2020 | 4/21/2020 | 4/21/2020 1:51:05 PM | P | PASS |
|
|
insulation // Kenny Phone #: ###-####. rigid insulation at interior side of stemwall under slab on grade
|
BLD19-04654
| BLD-Energy code compliance | 4/21/2020 | 4/21/2020 | 4/21/2020 1:50:44 PM | P | PASS |
|
|
insulation // Kenny Phone #: ###-####. rigid insulation at interior side of stemwall under slab on grade
|
BLD19-04638
| BLD-Energy code compliance | 4/21/2020 | 4/21/2020 | 4/21/2020 1:50:22 PM | P | PASS |
|
|
insulation // Kenny Phone #: ###-####. rigid insulation at interior side of stemwall under slab on grade
|
BLD20-00422
| BLD-Energy code compliance | 4/21/2020 | 4/21/2020 | 4/21/2020 1:50:03 PM | P | PASS |
|
|
insulation // Kenny Phone #: ###-####. rigid insulation at interior side of stemwall under slab on grade
|
BLD20-00371
| BLD-Energy code compliance | 4/21/2020 | 4/21/2020 | 4/21/2020 1:49:39 PM | P | PASS |
|
|
insulation // Kenny Phone #: ###-####. rigid insulation at interior side of stemwall under slab on grade
|
BLD19-04634
| BLD-Energy code compliance | 4/21/2020 | 4/21/2020 | 4/21/2020 1:49:13 PM | P | PASS |
|
|
insulation // Kenny Phone #: ###-####. rigid insulation at interior side of stemwall under slab on grade
|
BLD20-01081
| BLD-Final | 4/21/2020 | 4/21/2020 | 4/21/2020 1:48:18 PM | P | PASS |
|
|
onsite contact is sid ###-#### Phone #: ###-#### Inspection requested via web by Carissa Mattison. Ok for perm occ.
|
BLD20-00350
| BLD-Framing/Rough-in | 4/21/2020 | 4/21/2020 | 4/21/2020 1:47:25 PM | P | PASS |
|
|
Jean *cleared* Phone #: ###-####. Interior steel stud framed walls and both sides of demissing wall.
|
BLD20-00295
| BLD-Energy code compliance | 4/20/2020 | 4/21/2020 | 4/21/2020 11:07:15 AM | A | PASS |
|
|
screened // rod Phone #: ###-####. rigid insulation on stemwall.
|
BLD19-02851
| BLD-Foundation | 4/20/2020 | 4/21/2020 | 4/21/2020 10:04:21 AM | A | PART |
|
|
rebar- pouring at 1:45-Taylor **Cleared** Phone #: ###-####. perimeter frost wall. Ok to place concrete pending special inspection.
|
BLD20-00258
| BLD-Framing/Rough-in | 4/20/2020 | 4/21/2020 | 4/21/2020 9:48:47 AM | A | FAIL |
|
|
screened // Alan Phone #: ###-####. Provide truss engineering. roll block floor joist at glue lam beams in kitchen. Fire block at B vent, 2nd floor ceiling. Ok to insulate.
|
BLD19-04518
| BLD-Final | 4/20/2020 | 4/21/2020 | 4/21/2020 9:34:39 AM | A | CANC |
|
|
Requesting a late morning Building Final for Temp CofO Phase 1 Fire Alarm Inspection is at 7am Fire Life Safety is scheduled for after. Phone #: ###-#### >> Inspection requested via web by Markus Schlegel Inspection cancelled from web by: Markus Schlegel
|
BLD20-00444
| BLD-Energy code compliance | 4/20/2020 | 4/21/2020 | 4/21/2020 9:23:15 AM | A | NR |
|
|
screened // Alan Phone #: ###-####
|
BLD20-00444
| BLD-Framing/Rough-in | 4/21/2020 | 4/21/2020 | 4/21/2020 9:23:05 AM | A | FAIL |
|
|
screened // Alan Phone #: ###-####. All framing issues corrected except for lateral bracing on A07 trusses.
|
BLD19-03643
| BLD-Framing/Rough-in | 4/20/2020 | 4/21/2020 | 4/21/2020 8:53:02 AM | A | FAIL |
|
|
Screened-Tyler Phone #: ###-####. Nail off all simpson hangars. Nail off 3ply girder in garage per the engineering, plys not in contact. Complete lateral bracing on A01 thru A08 trusses. Fireblock common wall in garage with master at ceiling level. Correction notice posted. This framing inspection is for garage only.
|
MIS20-00126
| BLD-Conference | 4/21/2020 | 4/21/2020 | | P | |
|
|
|