BLD20-00017
| BLD-Framing/Rough-in | 4/3/2020 | 4/3/2020 | 4/3/2020 3:32:46 PM | P | PASS |
|
|
call for access // Randy stated no one will be onsite Phone #: ###-####
|
BLD18-04288
| BLD-Final | 4/2/2020 | 4/3/2020 | 4/3/2020 3:12:30 PM | P | PASS |
|
|
Please call in advance. No Superintendent on premises and gate requires code for access. Phone #: ###-#### Inspection requested via web by Ian Franklin
|
BLD18-04520
| BLD-Wall cover | 4/3/2020 | 4/3/2020 | 4/3/2020 2:27:21 PM | P | PASS |
|
|
Cover inspection for ceiling drops framing in Building 11 - Tower 2 (12 Units). Phone #: ###-#### Inspection requested via web by Bob Goodwin
|
BLD20-00150
| BLD-Framing/Rough-in | 4/1/2020 | 4/3/2020 | 4/3/2020 1:35:30 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Nail C3G 2ply per the engineering. Provide additional 2x studs under 2ply in garage, both ends. Seal all penetrations in draft stop and complete portion under stairs. Ok to insulate. Correction notice posted.
|
BLD20-00288
| BLD-Framing/Rough-in | 4/3/2020 | 4/3/2020 | 4/3/2020 1:12:20 PM | P | PASS |
|
|
cleared // Avery Phone #: ###-####
|
BLD19-04289
| BLD-Framing/Rough-in | 3/31/2020 | 4/3/2020 | 4/3/2020 12:56:52 PM | A | PASS |
|
|
greg Phone #: ###-####. Interior steel stud framed walls and hardlid appear to be ok. Inspection conducted via on line.
|
BLD18-01027
| BLD-Framing/Rough-in | 4/3/2020 | 4/3/2020 | 4/3/2020 11:30:29 AM | A | FAIL |
|
|
Through penetrations for line sets on level 3 and 4 MOB area is not installed per the supplied UL listing.
|
BLD19-04720
| BLD-Energy code compliance | 4/2/2020 | 4/3/2020 | 4/3/2020 9:51:35 AM | A | PASS |
|
|
Trevor Phone #: ###-####. Letter from engineer provided accepting the garage portal frame construction.
|
BLD19-04730
| BLD-Energy code compliance | 4/2/2020 | 4/3/2020 | 4/3/2020 9:50:59 AM | A | PASS |
|
|
Trevor Phone #: ###-####. Letter from engineer provided accepting the garage portal frame construction.
|
BLD20-00416
| BLD-Framing/Rough-in | 4/2/2020 | 4/3/2020 | 4/3/2020 9:14:44 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Robert Carlton. Interior steel stud framed walls ok. Screws removed, braces installed.
|
BLD19-04869
| BLD-Framing/Rough-in | 4/2/2020 | 4/3/2020 | 4/3/2020 8:50:53 AM | A | NR |
|
|
Door will be open on east side of building. Please call if questions. Phone #: ###-#### Inspection requested via web by Brad Zollinger
|
BLD20-00151
| BLD-Energy code compliance | 4/1/2020 | 4/3/2020 | 4/3/2020 8:33:24 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD20-00151
| BLD-Framing/Rough-in | 4/1/2020 | 4/3/2020 | 4/3/2020 8:33:10 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. All issues have been resolved.
|
BLD20-00416
| BLD-Framing/Rough-in | 4/1/2020 | 4/3/2020 | 4/1/2020 4:17:44 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Robert Carlton Inspection cancelled from web by: Robert Carlton
|