Inspections for the day of: Friday, April 3, 2020.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD20-00017 BLD-Framing/Rough-in4/3/20204/3/20204/3/2020 3:32:46 PMPPASS
call for access // Randy stated no one will be onsite Phone #: ###-####
BLD18-04288 BLD-Final4/2/20204/3/20204/3/2020 3:12:30 PMPPASS
Please call in advance. No Superintendent on premises and gate requires code for access. Phone #: ###-#### Inspection requested via web by Ian Franklin
BLD18-04520 BLD-Wall cover4/3/20204/3/20204/3/2020 2:27:21 PMPPASS
Cover inspection for ceiling drops framing in Building 11 - Tower 2 (12 Units). Phone #: ###-#### Inspection requested via web by Bob Goodwin
BLD20-00150 BLD-Framing/Rough-in4/1/20204/3/20204/3/2020 1:35:30 PMPFAIL
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Nail C3G 2ply per the engineering. Provide additional 2x studs under 2ply in garage, both ends. Seal all penetrations in draft stop and complete portion under stairs. Ok to insulate. Correction notice posted.
BLD20-00288 BLD-Framing/Rough-in4/3/20204/3/20204/3/2020 1:12:20 PMPPASS
cleared // Avery Phone #: ###-####
BLD19-04289 BLD-Framing/Rough-in3/31/20204/3/20204/3/2020 12:56:52 PMAPASS
greg Phone #: ###-####. Interior steel stud framed walls and hardlid appear to be ok. Inspection conducted via on line.
BLD18-01027 BLD-Framing/Rough-in4/3/20204/3/20204/3/2020 11:30:29 AMAFAIL
Through penetrations for line sets on level 3 and 4 MOB area is not installed per the supplied UL listing.
BLD19-04720 BLD-Energy code compliance4/2/20204/3/20204/3/2020 9:51:35 AMAPASS
Trevor Phone #: ###-####. Letter from engineer provided accepting the garage portal frame construction.
BLD19-04730 BLD-Energy code compliance4/2/20204/3/20204/3/2020 9:50:59 AMAPASS
Trevor Phone #: ###-####. Letter from engineer provided accepting the garage portal frame construction.
BLD20-00416 BLD-Framing/Rough-in4/2/20204/3/20204/3/2020 9:14:44 AMAPASS
Phone #: ###-#### Inspection requested via web by Robert Carlton. Interior steel stud framed walls ok. Screws removed, braces installed.
BLD19-04869 BLD-Framing/Rough-in4/2/20204/3/20204/3/2020 8:50:53 AMANR
Door will be open on east side of building. Please call if questions. Phone #: ###-#### Inspection requested via web by Brad Zollinger
BLD20-00151 BLD-Energy code compliance4/1/20204/3/20204/3/2020 8:33:24 AMAPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD20-00151 BLD-Framing/Rough-in4/1/20204/3/20204/3/2020 8:33:10 AMAPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle. All issues have been resolved.
BLD20-00416 BLD-Framing/Rough-in4/1/20204/3/20204/1/2020 4:17:44 PMACANC
Phone #: ###-#### >> Inspection requested via web by Robert Carlton Inspection cancelled from web by: Robert Carlton