Inspections for the day of: Thursday, April 9, 2020.
Number of inspections: 16
Percentage of inspections complete: 94 %
Percentage of inspections not complete: 6 %
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-01027 BLD-Conference4/1/20204/8/2020 A 
BLD20-00363 BLD-Ceiling Grid Inspection4/9/20204/9/20204/9/2020 3:42:48 PMPPASS
1 office. Phone #: ###-#### Inspection requested via web by Todd Landvatter
BLD18-02618 BLD-Foundation4/9/20204/9/20204/9/2020 2:26:57 PMPPASS
Robert *left voicemail, patio being enclosed** Phone #: ###-####. Verified existing foundation systen, installation of rigid insulation, floor framing and vapor barrier on top of slab. Also R30 insulation in floor. Ok to place floor decking and construct walls. inspection done on line via google duo.
BLD20-00822 BLD-Wall cover4/9/20204/9/20204/9/2020 1:58:13 PMPPASS
Screened- Phone #: ###-####
BLD18-04519 BLD-Framing/Rough-in4/8/20204/9/20204/9/2020 1:21:34 PMPFAIL
Building 10 Energy Seal, Fire Caulking ; Framing for Cover Phone #: ###-#### Inspection requested via web by Bob Goodwin. Complete fire caulking, fireblock fur out walls. Provide approved fix for missed bearing points on C3 trusses.
BLD20-01081 BLD-Framing/Rough-in4/8/20204/9/20204/9/2020 11:38:00 AMPPASS
Please call Sid ###-#### Phone #: ###-#### Inspection requested via web by Carissa Mattison
BLD19-02218 BLD-Final4/9/20204/9/20204/9/2020 11:37:43 AMPPASS
Phone #: ###-#### Inspection requested via web by nate hutton
BLD20-00153 BLD-Energy code compliance4/8/20204/9/20204/9/2020 11:12:07 AMPCANC
Phone #: ###-#### >> Inspection requested via web by Joel Hirtle Inspection cancelled from web by: Joel Hirtle
BLD20-00416 BLD-Other4/8/20204/9/20204/9/2020 10:23:40 AMADONE
Rebar Phone #: ###-#### Inspection requested via web by Robert Carlton
BLD19-01080 BLD - Request for Extension4/8/20204/9/20204/9/2020 9:50:19 AMAPASS
Mike **Request for Extension** Phone #: ###-####. Ok for 90 day extension.
BLD19-04926 BLD-Final4/8/20204/9/20204/9/2020 9:48:48 AMAPASS
Phone #: ###-#### Inspection requested via web by Korey Hall
BLD19-04926 DOC - Permit Finaled4/9/20204/9/20204/9/2020 9:48:39 AMPPASS
All bedroom furnishings have been removed from attic space. Door has been removed and sheetrocked. All missing smoke detectors installed.
BLD20-01048 BLD-Other4/8/20204/9/20204/9/2020 8:52:10 AMADONE
Inspection on a completed asphalt re-roof project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD20-01048 DOC - Permit Finaled4/9/20204/9/20204/9/2020 8:52:01 AMPPASS
All work appeared to be done in accordance with local codes and ordinances.
BLD20-00294 BLD-Energy code compliance4/9/20204/9/20204/9/2020 8:50:01 AMAPASS
Thank you Phone #: ###-#### Inspection requested via web by Allen Jones
BLD19-02021 BLD-Foundation4/7/20204/9/20204/9/2020 12:00:00 AMACANC
*screened* - Request last of morning - Corey Phone #: ###-####