Inspections for the day of: Wednesday, May 15, 2019.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS17-00248 MIS-Aging Inspection5/15/20195/15/20195/15/2019 4:16:43 PM FAIL
MIS17-00117 MIS-Aging Inspection5/15/20195/15/20195/15/2019 4:13:28 PM PEND
Still single family dwelling on site that has not been moved.
MIS17-00296 MIS-Aging Inspection5/15/20195/15/20195/15/2019 4:10:51 PM PASS
MIS17-00296 DOC - Permit Finaled5/15/20195/15/20195/15/2019 4:10:41 PMPPASS
A building permit was issued and finaled.
BLD19-00318 BLD-Framing/Rough-in5/8/20195/15/20195/15/2019 4:05:28 PMPFAIL
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Provide (2) 2x8 headers above opening to under stairs closet. Provide tempered glazing at window above soaker tub in master suite. Provide approved fix for cut floor joist by stairs were gurdrail has been reinforced. Ok to insulate. Correction notice posted.
BLD19-00494 BLD-Framing/Rough-in5/14/20195/15/20195/15/2019 3:44:00 PMPFAIL
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Install hte missing simpson hold down on iterior shear wall. Repair OSB on interior shear wall at electrical outlets and dryer vents. install missed lateral bracing on A8 and A9 trusses. Strap double top plate break on interior wall at D4G truss interior bearing. Provide gussett type connections for handstack truss above stairway and provide load path. Correction notice posted. Ok to insulate.
BLD19-00094 BLD-Final5/15/20195/15/20195/15/2019 2:20:03 PMPNR
Superintendent will be on site after 1:00 p.m. Phone #: ###-#### Inspection requested via web by Pat Churchman. Needs public works final and provide special inspection final letter.
BLD19-00191 BLD-Final5/15/20195/15/20195/15/2019 2:19:46 PMPNR
Superintendent will be on site after 1:00 p.m. Phone #: ###-#### Inspection requested via web by Pat Churchman. Install ADA hardware on acceible unit. Needs public works final and provide special inspection final letter.
BLD19-00267 BLD-Ceiling Grid Inspection5/15/20195/15/20195/15/2019 2:18:51 PMPPASS
Phone #: ###-#### Inspection requested via web by Adam Joslin
BLD19-00329 BLD-Foundation5/15/20195/15/20195/15/2019 1:07:25 PMPPASS
BLD19-00329 BLD-Footing5/15/20195/15/20195/15/2019 1:07:12 PMPPASS
BLD19-00496 BLD-Framing/Rough-in5/14/20195/15/20195/15/2019 11:28:45 AMAFAIL
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Provide approved fix for broken vertical member on A8 truss. Install the mised lateral bracing A3 truss. Lateral bracing on A5, A6, and A7 is not installed correctly. Install in accordance with truss engineering and accepted practice. Correction notice posted. OK TO INSULATE.
BLD19-00390 BLD-Framing/Rough-in5/14/20195/15/20195/15/2019 11:25:36 AMAPASS
Curit Phone #: ###-####
BLD19-01416 BLD-Final5/14/20195/15/20195/15/2019 10:15:04 AMAPASS
Alex-demo final Phone #: ###-####
BLD19-01416 DOC - Permit Finaled5/15/20195/15/20195/15/2019 10:14:55 AMPPASS
BLD18-04307 BLD-Framing/Rough-in5/14/20195/15/20195/15/2019 10:01:51 AMAPASS
Kenny Phone #: ###-####. Roof framing ok.
BLD19-00329 BLD-Foundation5/14/20195/15/20195/15/2019 9:38:04 AMAFAIL
Shawn-please call 30 mintues prior Phone #: ###-####
BLD19-00329 BLD-Footing5/14/20195/15/20195/15/2019 9:37:24 AMAFAIL
Shawn-please call 30 mintues prior Phone #: ###-####
BLD19-00521 BLD-Framing/Rough-in5/14/20195/15/20195/15/2019 9:04:42 AMAPASS
Josh-please call 30 minutes prior to meet Phone #: ###-####. New facade framing ok.
BLD19-00267 BLD-Ceiling Grid Inspection5/14/20195/15/20195/15/2019 8:39:33 AMAFAIL
Fire Sprinkler Inspected scheduled for AM - likely to occur early morning. Ceiling Grid Inspection to follow - late morning if possible. Phone #: ###-#### Inspection requested via web by Adam Joslin. Remove all tile for inspection.