BLD18-04294
| BLD-Foundation | 5/20/2019 | 5/21/2019 | 5/22/2019 7:36:16 AM | P | DEFR |
|
|
Trash enclosure foundation inspection. Concrete is scheduled for 3 pm. Phone #: ###-#### Inspection requested via web by Roger Graves. Will have special inspection.
|
BLD18-01425
| BLD-Ceiling Grid Inspection | 5/20/2019 | 5/21/2019 | 5/21/2019 3:19:47 PM | P | PART |
|
|
James Phone #: ###-####. Area 2 ceiling grid. Noted areas at 1hr smoke barrier, 2hr. fire wall and at joints not ready for cover.
|
BLD19-00621
| BLD-Wall Bracing | 5/21/2019 | 5/21/2019 | 5/21/2019 3:18:45 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD19-00808
| BLD-Wall Bracing | 5/20/2019 | 5/21/2019 | 5/21/2019 10:15:46 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD19-00508
| BLD-Final | 5/20/2019 | 5/21/2019 | 5/21/2019 9:44:46 AM | A | FAIL |
|
|
Christian Phone #: ###-####. A seperate permit is required for the racking the exceeds 8ft. in height.
|
BLD17-02871
| BLD-Ceiling Grid Inspection | 5/20/2019 | 5/21/2019 | 5/21/2019 9:43:01 AM | A | FAIL |
|
|
John Phone #: ###-####. All main runners and cross ties shall be tied to prevent spreading. Needs to install clips or spreader bars.
|
BLD19-01520
| BLD-Framing/Rough-in | 5/20/2019 | 5/21/2019 | 5/21/2019 8:57:36 AM | A | PASS |
|
|
call 20 minutes before // Greg Phone #: ###-####. Interior steel stud framed walls for new phone closet.
|
BLD19-01159
| BLD-Final | 5/20/2019 | 5/21/2019 | 5/21/2019 12:00:00 AM | P | CANC |
|
|
Scott-please call for access code Phone #: ###-####
cancel due to fire fail
|